Tuesday, April 13, 2021
Latest:
  • TEPCO Gains Permission To Dump Contaminated Water – What You Need To Know
  • SimplyInfo.org Coronavirus Live Blog 4.11.2021
  • SimplyInfo.org Coronavirus Live Blog 4.5.2021
  • Fukushima Daiichi Earthquake Damage Update 3.30.21
  • Update: Fukushima Unit 1 & 3 Containment Leaks

SimplyInfo.org

The Fukushima Project

SimplyInfo.org

  • The Disaster
    • Reactors
      • Reactor 1
      • Reactor 2
      • Reactor 3
      • Reactor 4
      • Reactor 5
      • Reactor 6
      • Common Pool & Cask Storage
    • Main Daiichi Disaster Timeline
    • Analysis: FUKUSHIMA FIRST HOURS
    • Daiichi Reactor Graphs
    • Fukushima Fire Engine Water
    • Fukushima Daiichi Source Term
    • Fukushima Historical Weather Maps
    • Yoshida Fukushima Testimony
  • News & Info
    • Important Links
    • Japan Reactor Restart Data
    • Reactor Systems Information
      • RCIC: Reactor Core Isolation Cooling
    • Spent Fuel Research & Safety
      • Lifting Fuel Elements Out Of The Fukushima Daiichi Spent Fuel Pools
      • Spent Fuel Pools At Fukushima; Follow On Report – Corrosion
      • Corrosion At Fukushima Daiichi Explained
    • NRC FOIA Documents
    • NRC Fukushima Transcripts
    • US NRC Documents
    • Japan Govt Documents
    • Japan Diet Fukushima Report Documents
    • Japan Nuclear Company Documents
    • Seismic Research
  • Fukushima Status
    • Latest Daiichi Readings
    • Fukushima Unit 1 Decommissioning
    • Fukushima Unit 2 Decommissioning
    • Fukushima Unit 3 Decommissioning
    • Reactor Decommissioning
    • Decomm Labs
    • Fukushima Contaminated Water – NEW
    • Fukushima Daiichi Detailed Plant Map 2015
    • Pre-Tsunami Damage At Fukushima Daiichi
    • Daiichi Plant Complex Radiation Maps
    • Daiichi Reactor Radiation Maps
    • Early Reactor Data – METI
    • Worker Death And Injury Information
    • TEPCO Reports
  • Monitoring Results
    • Environmental Monitoring
      • Radiation Networks Worldwide
      • Live Radiation Stations Fukushima And Japan
      • Fukushima Radiation Maps
      • Radiation Readings (Not Live Updated)
      • Sea Plume Modeling & Monitoring
      • Iodine 131 Modeling
      • DOE Radiation Data
    • Food Monitoring
      • Japan Food Monitoring
      • Japan Radiation Embargoed Food List
      • US & EU Food Monitoring
    • Useful Maps
    • IAEA
    • Human Exposures Fukushima
  • Nuclear Safety
    • Radiation Human Exposure Research
    • Radiation Exposure Help (Groups)
    • Japan Travel Guidelines
    • Radiation Limits In Food & Environment
    • Radiation Exposure Facts
    • Radiation Measuring And Conversions
    • US Weapons Fallout Exposures – CDC
    • EPA Radiation Plume Modeling Software
  • MEDIA
    • Image Archive
    • Video
    • News Archive
    • Document Archive
    • Scribble Live Blog Archive

removal

The Latest 

1254 Fuel Assemblies Removed From Fukushima Unit 4

September 17, 2014 Editor 0 Comments Fukushima Daiichi, removal, spent fuel pool, unit 4

TEPCO reported that as of September 16, 2014 they have removed 1254 fuel assemblies from unit 4’s fuel pool. This

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Refueling Machine Portion Falls In Spent Fuel Pool

August 29, 2014 Editor 0 Comments crane, daiichi, fall, fukushima, refueling, removal, spent fuel pool, unit 3

TEPCO is reporting that the console portion of the refueling machine that fell into the spent fuel pool of unit 3

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

TEPCO To Begin Unit 3 Crane Removal From Spent Fuel Pool

August 26, 2014August 26, 2014 Editor 0 Comments crane, daiichi, fukushima, removal, spent fuel pool, unit 3

A brief note in the daily reports mentioned that TEPCO will be pausing cooling to the unit 3 spent fuel

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4 Spent Fuel Removal Suspended For 3 Months

July 1, 2014 Editor 0 Comments fukushima, removal, spent fuel, suspended, unit 4

TEPCO announced that work to remove spent fuel from the unit 4 fuel pool will be suspended for 3 months.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

TEPCO Submits Plan For Fuel Removal At Unit 3 Fukushima Daiichi

June 30, 2014June 29, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 3

TEPCO submitted plans to the NRA for spent fuel removal from unit 3. This included more detail on how they

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 1122 Spent Fuel Assemblies Removed

June 26, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

There are 411 spent fuel assemblies left to remove from unit 4 at Fukushima Daiichi. 1122 have been removed as

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Some Spent Fuel From Fukushima Unit 4 To Be Sent To Unit 6

June 19, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4, unit 6

TEPCO is asking for permission to make an unusual change to the removal of spent fuel at unit 4. The

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 3 Spent Fuel Pool Debris Removal Progress

June 3, 2014 Editor 0 Comments crane, debris, fukushima, removal, spent fuel, unit 3

TEPCO has progressed on removing debris from the unit 3 spent fuel pool. The current work is to dismantle the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 968 Fuel Assemblies Removed

June 2, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

968 fuel assemblies have been removed from the unit 4 spent fuel pool to the common pool. http://www.tepco.co.jp/en/decommision/index-e.html This article

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 924 Fuel Assemblies Removed

May 26, 2014 Editor 0 Comments fuel, fukushima, removal, unit 4

924 fuel assemblies have been removed from the spent fuel pool of unit 4 and placed into the common pool

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 880 Fuel Assemblies Removed

May 20, 2014 Editor 0 Comments fuel, fukushima, removal, unit 4

880 fuel assemblies have been removed from unit 4 to the common pool as of Monday. http://www.tepco.co.jp/en/decommision/index-e.html This article would

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Plans To Flood Fukushima Containments Scrapped

May 12, 2014 Editor 0 Comments Containment, decommissioning, flood, fuel, fukushima, removal

The entire decommissioning plan has hinged on this one thing, the ability to flood the containment structures of the reactors

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4 Fuel Removal Hits Half Way Mark

May 1, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

Don’t pop the champagne quite yet. Removal of spent fuel from the damaged unit 4 fuel pool has crossed the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Spent Fuel Progress Report

April 29, 2014April 29, 2014 Editor 0 Comments cask, common pool, fukushima, removal, spent fuel

Spent fuel processing at Fukushima has made some new progress though much work remains with higher risk work being left

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 704 Fuel Assemblies Removed

April 23, 2014April 23, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

704 fuel assemblies have been removed from the unit 4 spent fuel pool to the common pool as of this

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 638 Fuel Assemblies Removed

April 14, 2014 Editor 0 Comments fukushima, removal, spent fuel pool, unit 4

638 spent fuel assemblies have been removed from the unit 4 spent fuel pool to the common pool as of

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 594 Fuel Assemblies Removed

April 7, 2014 Editor 0 Comments assemblies, fukushima, removal, spent fuel, unit 4

594 fuel assemblies have been removed to the common pool from unit 4’s spent fuel pool. http://www.tepco.co.jp/en/decommision/index-e.html   This article

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 3 Fuel Pool Debris Removal Progress

April 3, 2014April 3, 2014 Editor 0 Comments debris, fukushima, removal, spent fuel pool, unit 3

TEPCO has accomplished some debris removal from the spent fuel pool as documented in this report. Earlier in 2014 work

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

528 Fuel Assemblies Removed At Fukushima Unit 4

March 25, 2014March 25, 2014 Editor 0 Comments fuel, removal, spent fuel, unit 4

528 fuel assemblies have been moved to the common pool from unit 4’s spent fuel pool as of yesterday. This

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 374 Fuel Assemblies Removed

February 25, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

374 fuel assemblies have been moved from unit 4’s spent fuel pool to the common pool as of this week.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 352 Fuel Assemblies Removed

February 17, 2014February 17, 2014 Editor 0 Comments fukushima, removal, spent fuel, unit 4

TEPCO reports a total of 352 fuel assemblies have been removed from the unit 4 spent fuel pool as of

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4; 308 Fuel Assemblies Removed

February 11, 2014February 11, 2014 Editor 0 Comments common pool, fukushima, removal, spent fuel, unit 4

308 assemblies have been removed from the unit 4 spent fuel pool. The assemblies were transferred to the common pool

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

264 Fuel Assemblies Removed At Fukushima Unit 4

February 3, 2014 Editor 0 Comments daiichi, fukushima, removal, spent fuel, unit 4

264 fuel assemblies have been removed to the common pool from unit 4. http://www.tepco.co.jp/en/nu/fukushima-np/removal4u/index-e.html This article would not be possible

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4 198 Assemblies Removed

January 21, 2014 Editor 0 Comments fuel, fukushima, removal, unit 4

TEPCO announced late yesterday that another round of fuel assemblies was removed from unit 4 to the common pool at

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

176 Fuel Assemblies Removed From Unit 4 Fukushima Daiichi

January 20, 2014 Editor 0 Comments daiichi, fukushima, removal, spent fuel, unit 4

TEPCO’s weekly update on fuel removed from Unit 4’s spent fuel pool now sits at 176 spent assemblies removed from

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Spent Fuel Moved At Unit 4, 88 Total Removed

December 18, 2013 Editor 0 Comments common pool, fukushima, removal, spent fuel, unit 4

Another cask of spent fuel has been transferred to the common pool from unit 4 at Fukushima Daiichi. This makes

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Second Set Of Unit 4 Fuel Loaded In Common Pool

November 30, 2013 Editor 0 Comments fukushima, removal, spent fuel, transfer, unit 4

TEPCO reports as of November 30, 2013 JST the second set of 22 fuel assemblies were loaded into the fuel

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 3 Spent Fuel Pool; Debris Removal Preparation Begins

November 29, 2013 Editor 0 Comments debris, pool, removal, spent fuel, unit 3

Kyodo News announced yesterday that preparations are underway to remove the debris from the unit 3 spent fuel pool at

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Cask Filled, Transit Prep Tomorrow 11.27.13

November 27, 2013 Editor 0 Comments removal, spent fuel, unit 4

TEPCO announced an additional 16 spent fuel assemblies were loaded into the transport cask by the end of the day

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Removal Work Begins For Wednesday

November 27, 2013 Editor 0 Comments fukushima, removal, spent fuel, unit 4

TEPCO announced work to begin taking out spent fuel at unit 4 resumed this Wednesday morning JST. http://www.tepco.co.jp/cc/press/2013/1232461_5117.html   This

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Removal; 6 Assemblies Removed To Cask Today

November 26, 2013 Editor 0 Comments fuel, fukushima, removal, unit 4

TEPCO has announced that 6 fuel assemblies have been removed from the pool racks to the transport cask by the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Removal Resumes Tuesday

November 25, 2013 Editor 0 Comments pool, removal, spent fuel, unit 4

NHK is reporting that TEPCO will continue the process to remove spent fuel from the unit 4 pool on Tuesday

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Unloaded Into Common Pool; Video & Photos

November 22, 2013 Editor 0 Comments common pool, fuel, fukushima, removal, spent fuel, unit 4

TEPCO announced they have removed the first load of fuel from unit 4 to the racks in the common pool.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

U4 Fuel Cask Moved To Common Pool Building

November 21, 2013 Editor 0 Comments cask, fuel, fukushima, removal, spent fuel, unit 4

NHK and TEPCO have announced that the first cask of fuel assemblies has been moved from unit 4 to the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 4 Cask Moved, New Underwater Video

November 20, 2013 Editor 0 Comments cask, fuel, pool, removal, spent fuel, unit 4

NHK is reporting that the cask transport effort took place Wednesday day. TEPCO has not forwarded any additional announcements at

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

First Cask Filled At Unit 4 Fukushima Daiichi

November 19, 2013 Editor 0 Comments cask, fuel, fukushima, removal, spent fuel, unit 4

TEPCO announced that they have filled the first cask with fuel as of 6:28PM JST Tuesday. A total of 22

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Loaded In Cask At Fukushima Daiichi

November 18, 2013 Editor 0 Comments fuel, fukushima, removal, spent fuel, unit 4

TEPCO has released photos of the first fuel successfully removed from the fuel racks at unit 4. NHK reports the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Assemblies To Be Removed 3pm JST Today

November 18, 2013 Editor 0 Comments fukushima, removal, spent fuel, unit 4

French journalist Joel Legendre is reporting that TEPCO will begin removing the first fuel assemblies from the spent fuel pool

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Work Begins On Unit 4 Spent Fuel Pool About Now

November 18, 2013 Editor 0 Comments fuel, fukushima, removal, unit 4

NHK reports It is roughly 9:59am as this is being written. Workers at Fukushima Daiichi should have begun the process

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Unit 4 Fuel Removal; What You Need To Know

November 12, 2013November 11, 2013 Editor 0 Comments criticality, fukushima, information, removal, risks, spent fuel, unit 4

There are lots of concerns about the upcoming fuel removal work at unit 4. With this has come some passing

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
  • ← Previous
  • Next →
en English
en Englishja Japanesede Germanfr Frenchko Koreanzh-CN Chinese (Simplified)es Spanishit Italianpl Polishhi Hindibn Bengaliru Russianuk Ukrainianbe Belarusianuz Uzbekmn Mongolianar Arabicfa Persiantr Turkishpt Portugueseth Thaivi Vietnamesecs Czechda Danishnl Dutchet Estonian

Quick Start Menu

  • JOIN CHAT
  • Chat Technical Help
  • About Us
  • Contact US
  • Copyright Policy
  • Fukushima Calendar
  • SimplyInfo Research Papers
  • Photo Gallery
  • Videos
  • News Archive
  • The Library
  • TEPCO Data Links
  • TEPCO Super Search Tool
  • TEPCO Documents
  • TEPCO Live Camera Unit 4
  • TEPCO Live Camera Unit 1
  • TBS Live Camera
  • NRA Timeline Of Actions
  • Chernobyl Web Cam
  • The Real Risks At Oi
  • Fukushima Radiation Releases
  • Request A Study To Be Pulled
  • Newsletter Archive
  • Covid19 Archive

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Categories

  • Citizen Reporting (41)
  • Covid19 Archive (142)
  • Current Readings (15)
  • Daiichi NPP (16)
  • Digests (2)
  • Earthquake Reports (3)
  • Environmental Reports (2)
  • Featured (81)
  • Food/Water Contamination (19)
  • Forensics (1)
  • Fukushima and Japan (6)
  • Fukushima Area Impact (10)
  • Fukushima Status (7)
  • German Energy (25)
  • Health Risks (12)
  • Humanitarian (41)
  • IAEA (4)
  • JAIF (1)
  • Japan Exposure (28)
  • Japan Impact (13)
  • Media (2)
  • METI (11)
  • MEXT (9)
  • Monitoring Results (12)
  • Mox in Japan (7)
  • News & Info. (13)
  • NISA (6)
  • Nuclear Safety (2)
  • On the Ground (3)
  • Other Buildings (1)
  • Peer Review (38)
  • Plant Status (51)
  • Protect Yourself (18)
  • Radiation Exposure (43)
  • Radiation Readings (7)
  • Reactor 1 (6)
  • Reactor 2 (3)
  • Reactor 3 (8)
  • Reactor 4 (7)
  • Reactor 5 (2)
  • Reactor 6 (2)
  • Reporting Agencies (9)
  • Research Projects (7)
  • Sea/Soil Contamination (14)
  • Technical Documents (13)
  • TEPCO (25)
  • Testing (2)
  • The Latest (2,539)
  • The Library (6)
  • Uncategorized (178)
  • US Nuclear News (56)
  • User Pages (1)
  • Weather (12)
  • Worldwide Exposure (24)
Copyright © 2021 SimplyInfo.org. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.
loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.