Saturday, January 23, 2021
Latest:
  • SimplyInfo.org Coronavirus Live Blog 1.15.2021
  • SimplyInfo.org Coronavirus Live Blog 1.6.2021
  • Japan’s Nuclear Safety Rules Found To Be Flawed
  • SimplyInfo.org; Fukushima Update November 2020
  • UN Bans Nuclear Weapons, Goes Into Effect January 22

SimplyInfo.org

The Fukushima Project

SimplyInfo.org

  • The Disaster
    • Reactors
      • Reactor 1
      • Reactor 2
      • Reactor 3
      • Reactor 4
      • Reactor 5
      • Reactor 6
      • Common Pool & Cask Storage
    • Main Daiichi Disaster Timeline
    • Analysis: FUKUSHIMA FIRST HOURS
    • Daiichi Reactor Graphs
    • Fukushima Fire Engine Water
    • Fukushima Daiichi Source Term
    • Fukushima Historical Weather Maps
    • Yoshida Fukushima Testimony
  • News & Info
    • Important Links
    • Japan Reactor Restart Data
    • Reactor Systems Information
      • RCIC: Reactor Core Isolation Cooling
    • Spent Fuel Research & Safety
      • Lifting Fuel Elements Out Of The Fukushima Daiichi Spent Fuel Pools
      • Spent Fuel Pools At Fukushima; Follow On Report – Corrosion
      • Corrosion At Fukushima Daiichi Explained
    • NRC FOIA Documents
    • NRC Fukushima Transcripts
    • US NRC Documents
    • Japan Govt Documents
    • Japan Diet Fukushima Report Documents
    • Japan Nuclear Company Documents
    • Seismic Research
  • Fukushima Status
    • Latest Daiichi Readings
    • Fukushima Unit 1 Decommissioning
    • Fukushima Unit 2 Decommissioning
    • Fukushima Unit 3 Decommissioning
    • Reactor Decommissioning
    • Decomm Labs
    • Fukushima Contaminated Water – NEW
    • Fukushima Daiichi Detailed Plant Map 2015
    • Pre-Tsunami Damage At Fukushima Daiichi
    • Daiichi Plant Complex Radiation Maps
    • Daiichi Reactor Radiation Maps
    • Early Reactor Data – METI
    • Worker Death And Injury Information
    • TEPCO Reports
  • Monitoring Results
    • Environmental Monitoring
      • Radiation Networks Worldwide
      • Live Radiation Stations Fukushima And Japan
      • Fukushima Radiation Maps
      • Radiation Readings (Not Live Updated)
      • Sea Plume Modeling & Monitoring
      • Iodine 131 Modeling
      • DOE Radiation Data
    • Food Monitoring
      • Japan Food Monitoring
      • Japan Radiation Embargoed Food List
      • US & EU Food Monitoring
    • Useful Maps
    • IAEA
    • Human Exposures Fukushima
  • Nuclear Safety
    • Radiation Human Exposure Research
    • Radiation Exposure Help (Groups)
    • Japan Travel Guidelines
    • Radiation Limits In Food & Environment
    • Radiation Exposure Facts
    • Radiation Measuring And Conversions
    • US Weapons Fallout Exposures – CDC
    • EPA Radiation Plume Modeling Software
  • MEDIA
    • Image Archive
    • Video
    • News Archive
    • Document Archive
    • Scribble Live Blog Archive

vent tower

The Latest Uncategorized 

New High Risk Work For Fukushima Daiichi Announced

May 18, 2020May 16, 2020 Editor 0 Comments decommissioning, Fukushima Daiichi, SGTS, unit 1, unit 2, vent tower

TEPCO has announced new work at Fukushima Daiichi related to the unit 1-2 vent tower. This location has the highest

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
Covid19 Archive 

Fukushima Unit 1-2 Vent Tower Dismantled

May 6, 2020May 28, 2020 Editor 0 Comments daiichi, fukushima, removal, unit 1, unit 2, vent tower

The upper half of the unit 1-2 vent tower has been cut down and the vent pipe has been capped.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

SimplyInfo.org Annual Report; Plant Facilities

March 17, 2020March 13, 2020 Editor 0 Comments 9th anniversary, annual report, decommissioning, Fukushima Daiichi, plant work, simplyinfo.org, vent tower, waste

This is one section of our annual report, the full report can be found here. We will be posting a

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Radioactive Sump Water Disappears

December 23, 2019December 19, 2019 Editor 1 Comment contaminated water leak, Fukushima Daiichi, leak, sump pit, unit 1 2, vent tower

Radioactive water in the sump pit at the base of the unit 1-2 vent tower at Fukushima Daiichi escaped in

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Runaway Bus Causes Damage At Fukushima Daiichi

December 20, 2019December 18, 2019 Editor 0 Comments bus, damage, Fukushima Daiichi, unit 1, unit 2, vent tower

The bus used as a remote command center for the work to cut down the unit 1-2 vent tower took

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 1-2 Vent Tower Progress Update

November 4, 2019November 4, 2019 Editor 0 Comments daiichi, fukushima, removal, unit 1 2 vent tower, vent tower

The unit 1-2 vent tower at Fukushima Daiichi is the most dangerous location on site outside of the reactor buildings.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Demolition Rig For Fukushima Vent Tower Has 3 Failures

September 1, 2019August 28, 2019 Editor 0 Comments daiichi, decommissioning, failure, fukushima, rig, vent tower

The remote cutting rig for dismantling the highly contaminated unit 1-2 vent tower has had three failures since it began

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Unit 1; Site Of Significant New Work

August 6, 2019August 6, 2019 Editor 1 Comment containment inspection, daiichi, fukushima, reactor well inspection, spent fuel pool, unit 1, vent tower

Fukushima Unit 1 has been the site of significant new work on multiple fronts. We outline the new events and

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

How Work To Remove A Radioactive Tower At Fukushima Daiichi Went Wrong

June 12, 2019June 11, 2019 Editor 0 Comments 2019, cutting, decommissioning, fukushima, removal, unit 1, unit 2, vent tower

Measure twice, cut once. Work to remove the highly contaminated units 1-2 vent tower at Fukushima Daiichi took an unfortunate

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more

Fukushima Daiichi Unit 1-2 Vent Tower Removal Starts

Originally scheduled for May 20th. This event has now been postponed to some time in June.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

TEPCO Has A Plan For Some Of The More Dangerous Work At Daiichi

July 24, 2018July 23, 2018 Editor 0 Comments cutting, dismantling, fukushima, removal, unit 1, unit 2, vent tower

One of the most dangerous places at Fukushima Daiichi may undergo work to reduce the ongoing risk. Soon after the

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Vent Tower Drone Inspection Completed

October 24, 2016 Editor 0 Comments drone, fukushima, unit 1, unit 2, vent tower

TEPCO reported on October 20th that they completed the drone inspections of unit 1-2 vent tower. Minimal data was provided

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Drones Used To Inspect Fukushima Vent Tower

October 3, 2016October 1, 2016 Editor 0 Comments drone, fukushima, unit 1, unit 2, vent tower

A flying quadcopter was used to attempt to inspect the Unit 1-2 vent tower at Fukushima Daiichi. The tower has

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

Fukushima Vent Tower 1-2 Water Drain Sampling Results

September 14, 2016September 14, 2016 Editor 0 Comments contaminated water, fukushima, unit 1, unit 2, vent tower

TEPCO has successfully obtained a sample and water depth for the sump drain connected to the unit 1-2 vent tower.

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

The Big Job To Sample Water At A Fukushima Vent Stack

September 3, 2016September 2, 2016 Editor 0 Comments daiichi, drain pit, fukushima, unit 1, unit 2, vent tower, work

The effort to deal with the unit 1-2 vent stack has grown in complexity. TEPCO claims in this new work

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
The Latest 

TEPCO Says Unit 1-2 Vent Tower Probably OK For Now

October 12, 2015October 11, 2015 Editor 0 Comments damage, unit 1, unit 2, vent tower, worker

TEPCO has been doing another round of inspections on the unit 1-2 vent tower. They told Mainichi they didn’t think

Share this:

  • Facebook
  • Twitter
  • Email
  • Print
Read more
en English
en Englishja Japanesede Germanfr Frenchko Koreanzh-CN Chinese (Simplified)es Spanishit Italianpl Polishhi Hindibn Bengaliru Russianuk Ukrainianbe Belarusianuz Uzbekmn Mongolianar Arabicfa Persiantr Turkishpt Portugueseth Thaivi Vietnamesecs Czechda Danishnl Dutchet Estonian

Quick Start Menu

  • JOIN CHAT
  • Chat Technical Help
  • About Us
  • Contact US
  • Copyright Policy
  • Fukushima Calendar
  • SimplyInfo Research Papers
  • Photo Gallery
  • Videos
  • News Archive
  • The Library
  • TEPCO Data Links
  • TEPCO Super Search Tool
  • TEPCO Documents
  • TEPCO Live Camera Unit 4
  • TEPCO Live Camera Unit 1
  • TBS Live Camera
  • NRA Timeline Of Actions
  • Chernobyl Web Cam
  • The Real Risks At Oi
  • Fukushima Radiation Releases
  • Request A Study To Be Pulled
  • Newsletter Archive
  • Covid19 Archive

Archives

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Categories

  • Citizen Reporting (41)
  • Covid19 Archive (132)
  • Current Readings (15)
  • Daiichi NPP (16)
  • Digests (2)
  • Earthquake Reports (3)
  • Environmental Reports (2)
  • Featured (81)
  • Food/Water Contamination (19)
  • Forensics (1)
  • Fukushima and Japan (6)
  • Fukushima Area Impact (10)
  • Fukushima Status (7)
  • German Energy (25)
  • Health Risks (12)
  • Humanitarian (41)
  • IAEA (4)
  • JAIF (1)
  • Japan Exposure (28)
  • Japan Impact (13)
  • Media (2)
  • METI (11)
  • MEXT (9)
  • Monitoring Results (12)
  • Mox in Japan (7)
  • News & Info. (13)
  • NISA (6)
  • Nuclear Safety (2)
  • On the Ground (3)
  • Other Buildings (1)
  • Peer Review (38)
  • Plant Status (51)
  • Protect Yourself (18)
  • Radiation Exposure (43)
  • Radiation Readings (7)
  • Reactor 1 (6)
  • Reactor 2 (3)
  • Reactor 3 (8)
  • Reactor 4 (7)
  • Reactor 5 (2)
  • Reactor 6 (2)
  • Reporting Agencies (9)
  • Research Projects (7)
  • Sea/Soil Contamination (14)
  • Technical Documents (13)
  • TEPCO (25)
  • Testing (2)
  • The Latest (2,525)
  • The Library (6)
  • Uncategorized (179)
  • US Nuclear News (56)
  • User Pages (1)
  • Weather (12)
  • Worldwide Exposure (24)
Copyright © 2021 SimplyInfo.org. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.
loading Cancel
Post was not sent - check your email addresses!
Email check failed, please try again
Sorry, your blog cannot share posts by email.