for all the reactors in japan that were shaken by the earthquakes and still remain up.. their power level should be lowered and the earth quake setpoints should be reduced to 75% or so of what currently set... this downgrade should be initiated immediation and continue until an independent seismic walkdown and inspection is performed.
by dean 5/1/2011 2:00:12 AM

immediately*
by dean 5/1/2011 2:00:45 AM

for all reactors now down.. the same goes for the setpoints until the inspection is done and the seismic should be done before restart
by dean 5/1/2011 2:01:43 AM

interim steps Ralph,, with graded approach to regaining power.. .
by dean 5/1/2011 2:02:38 AM

I don't think they have,,, those plants are huge and piping all over.. the pipe hangers and seismic restraints should all be check I think
by dean 5/1/2011 2:03:23 AM

I don't think all plants shutdown through the earthquakes or the after shocks... just depended on where they were
by dean 5/1/2011 2:04:11 AM

its a profitability thing to me
by dean 5/1/2011 2:04:32 AM

in a commercial power plant it would take a long time to complete the walkdown analysis correctly
by dean 5/1/2011 2:05:02 AM

right Ralph
by dean 5/1/2011 2:08:53 AM

by dean 5/1/2011 2:18:00 AM

YEH Jim and remember he was talking about detonations verses defragations. or what every it was
by dean 5/1/2011 2:23:08 AM

I thoght I understood his opinion that hydrogen explosion would not have created the fire ball .. but a prompt critical accident would
by dean 5/1/2011 2:24:07 AM

nancy.. I say pull back the extensions of all mark 1's and do what I mentioned about lowering the EQ scram point and perform the seismic. check the pipe seismic supports, and spring hangers etc.. before restart
by dean 5/1/2011 2:26:41 AM