@ikrockhopper I dont rely on google they can be wrong I ask you if it is important so I know I have it right
by elainekirk 8/25/2011 9:53:49 AM

@ikrockhopper the doc you have brought up I tried in google and it was very strange very very strange translating :)
by elainekirk 8/25/2011 9:55:09 AM

@ikrockhopper Ah that is good I downloaded a copy earlier because I don't trust any of them I like the vimeo vid laughing at iaea
by elainekirk 8/25/2011 9:57:20 AM

@ikrockhopper yes it is important is this document saying the same
article.nuclear.or.kr it doesnt have the pg 66 chart but it has others
article.nuclear.or.kr I wondered if it was english version
by elainekirk 8/25/2011 10:00:02 AM

@ikrockhopper but probably it is the doc that the iaea stored doc refers to when it talks of oscaar
by elainekirk 8/25/2011 10:00:43 AM

@ikrockhopper there must be so many docs we haven't found yet I will use keywords from that to see if I can find others
by elainekirk 8/25/2011 10:05:08 AM

@ikrockhopper you need to rest please relax and sleep well we care for you and you need to care for you too
by elainekirk 8/25/2011 10:05:40 AM

@ikrockhopper yes thankyou
by elainekirk 8/25/2011 10:07:05 AM

@ikrockhopper I see the badge on your profile that is very clever :)
by elainekirk 8/25/2011 10:08:21 AM

@ikrockhopper I must have missed that while daughter was 'exercising' my bank card yesterday
by elainekirk 8/25/2011 10:11:18 AM

@ikrockhopper oh right I will busy myself promoting that :) going to change my profile and put the badge on :)
by elainekirk 8/25/2011 10:11:56 AM

TEPCO says it thought 2008 calculation on tsunami deserved no publicityTOKYO, Aug. 25, Kyodo
Tokyo Electric Power Co. said Thursday it had not reported the result of its 2008 calculation that a tsunami higher than 10 meters could hit the Fukushima Daiichi nuclear power plant because it saw no point at the time in publicizing something based on a host of assumptions.
The problem surfaced Wednesday as the Nuclear and Industrial Safety Agency said it was informed of the calculation verbally by a manager at the utility known as TEPCO on March 7, just before a magnitude-9.0 earthquake and ensuing tsunami as high as 15 meters hit the plant on March 11, leading to meltdowns of its reactors.
At a press conference Thursday, Yoshinori Moriyama, a senior official at the agency under the Ministry of Economy, Trade and Industry, criticized the utility's failure to report the calculation for nearly three years, saying it should have reported it at an early date.
english.kyodonews.jp by Edano 8/25/2011 10:14:02 AM

@ikrockhopper I will
@Edano we need you to interpret
by elainekirk 8/25/2011 10:14:55 AM

@ikrockhopper yes, girls ?
by Edano 8/25/2011 10:15:06 AM

@Edano all girls lol :)
by elainekirk 8/25/2011 10:15:39 AM

@ikrockhopper no
by Edano 8/25/2011 10:16:17 AM

@Edano
www.iaea.org page 66 man edano please
by elainekirk 8/25/2011 10:16:56 AM

is this yamashita ?
by Edano 8/25/2011 10:17:46 AM

@Edano no it is a doc Japanese drew up in '02 on risks pg 66 has a graph we need to understand
by elainekirk 8/25/2011 10:18:38 AM

@Edano the writing in the graph
I am sure Edano-san will know. The box on the top (left hand side one) = 過圧破損 = over-pressure damage (?) Another box on the top (right side) = 早期破損 =Early damage (it says... I don't know what it means). The middle box =管理放出 =Managed vent. Right-hand side bottom = 事故終息 = end of the accident.
from rockhopper
by elainekirk 8/25/2011 10:19:58 AM

oooh, all in japanese.
by Edano 8/25/2011 10:23:09 AM