nettv.gov-online.go.jp Press Conference by the Chief Cabinet Secretary (April 22th, 2011, at9:44)
by e123 4/22/2011 5:28:36 AM
@Radioguy Love it, nicely done! Crisp, clean, appealing and with lots of great info.
by Bev 4/22/2011 5:30:28 AM
@all Very nice word crafting, time now to put it together.
by JMV 4/22/2011 5:31:33 AM
@radioguy - Awesome! The more the better.
by JMV 4/22/2011 5:33:25 AM
One typo jumped out at me, toward the bottom. It says "lesson" rather than "lessen" with regard to radiation exposure.
by Bev 4/22/2011 5:33:34 AM
@e123 omg- english! TY
by marie rich 4/22/2011 5:34:01 AM
@all This is just my working copy. I'll post it on the ozcatradio pages when it's filled in more. Then i'll give you the published link too.
by radioguy 4/22/2011 5:36:50 AM
@e123 Some areas have too much radiation and some people should leave as soon as possible. Other areas they can take more time...wtf? I hope they put out a detailed map
"The Nuclear and Industrial Safety Agency said the Fukushima Daini nuclear plant, the companion of the crippled Daiichi plant 10 km (6 miles) away, was still leaking radiation but had cleared a key milestone toward stabilizing". www.reuters.com
by JMV 4/22/2011 6:00:18 AM
@JMV I just want to know, how Khan can say they are not in meltdown,. when they have not been able to get anywhere close due to the leaks and radiation strength ?
by VeenOui 4/22/2011 6:06:57 AM
@VeenOui - My thought exactly. But I was unaware Daini was leaking along with Daichi when did that happen?
by JMV 4/22/2011 6:12:41 AM
He said "not completely melted". "70% Nuclear Rods Damaged on Fukushima Reactor 1, 33% Damaged on Reactor 2, Partial Reactor Core Melting Possible" www.technology.am
by Ralph Unger 4/22/2011 6:14:45 AM
@Ralph Unger But what about Daini?
by JMV 4/22/2011 6:16:34 AM
'The 6 problem reactors which have gotten all of the press are located within the Fukushima Daiichi complex.
However, the same nuclear power plant operator that runs the Daiichi complex - Tepco - runs a separate nuclear complex 7 miles away, called Fukushima Daini. There are 4 reactors located at the Daini complex.
On March 12th, Tepco reported:
Unit 1
- At 8:19am, there was an alarm indicating that one of the control rods was not properly inserted, however, at 10:43am the alarm was automatically called off. Other control rods has been confirmed that they are fully inserted (reactor is in subcritical status)
***
- At 6:08PM, we announced the increase in reactor containment vessel pressure, assumed to be due to leakage of reactor coolant. However, we do not believe there is leakage of reactor coolant in the containment vessel at this moment.
- At 5:22AM, the temperature of the suppression chamber exceeded 100 degrees. As the reactor pressure suppression function was lost, at 5:22AM, it was determined that a specific incident stipulated in article 15, clause 1 has occurred.
(Article 15, Clause 1 of Japan's Act on Special Measures Concerning Nuclear Emergency Preparedness simply provides that there are elevated radiation levels or that "an event specified by a Cabinet Order as an event that indicates the occurrence of a nuclear emergency situation has occurred.") On March 14th, Reuters reported:
Tokyo Electric Power Co Inc said on Monday it had detected a rise in radiation levels at its Fukushima Daini nuclear power plant.
A company spokesman said that the cooling process at the plant has been working properly and that the rise was probably due to radiation leak at the nearby Fukushima Daiichi nuclear complex, where cooling functions were damaged by Friday's massive earthquake and tsunami.
Today, Tepco announced that smoke was seen rising from Daini reactor number 1:
Smoke was spotted at another nuclear plant in northeastern Japan on Wednesday, Tokyo Electric Power Co. said.
The company said smoke was detected in the turbine building of reactor No. 1 at the Fukushima Daini nuclear power plant around 6 p.m. (5 a.m. ET).
Smoke could no longer be seen by around 7 p.m. (6 a.m. ET), a company spokesman told reporters''. georgewashington2.blogspot.com
by JMV 4/22/2011 6:23:42 AM
I cannot find any updates on it. I remember that they had a small leak a few days ago. "All Fukushima Daini units in cold shutdown" www.world-nuclear-news.org
by Ralph Unger 4/22/2011 6:24:46 AM
Daini has been leaking since the 12th and they've been blaming it on Daichi. Today we hear they "had cleared a key milestone toward stabilizing"
by JMV 4/22/2011 6:29:43 AM
@JMV Stabilizing can simple mean, that they managed to put a concrete block under the loose SFP
by VeenOui 4/22/2011 6:30:34 AM
@VeenOui You made me laugh.
by JMV 4/22/2011 6:31:19 AM
@Veen, they ran out of diapers? That is the stuff they called "absorbent material", it was the stuff used to make diapers.
by Ralph Unger 4/22/2011 6:33:34 AM
@VeenOui And you're probably not far off from the truth.
by JMV 4/22/2011 6:33:43 AM
It took them more than a month to properly reinserted one control rod...smells fishy to me.
by JMV 4/22/2011 6:36:08 AM
by e123 4/22/2011 7:02:16 AM
from yesterday but only ulploaded 2 hours ago
by e123 4/22/2011 7:02:36 AM
Detailed information on radiation accidents since 100 B.C.: translate.google.com
I will be in and out to check nobody is stuck in moderation I don't know if any other mods are around so please be patient anybody waiting will be cleared to auto post as often as possible . All posts will be cleared.
by elainekirk 4/22/2011 9:14:21 AM
by e123 4/22/2011 9:33:27 AM
It is a picture of the last 20km is within a hazard area. Fukushima flew to verify the facts in their eyes. Signal just before the town 夫沢 Ookuma Hutaba gun, Fukushima Prefecture (Family is) in 引Ki返Shimashita. I saw several 20km electricity lit the house after the inspection area. Both cars come across local people who had come to pick up luggage. Masks, goggles, who had also been entered into without walking people wearing masks have also Irasshare protective clothing. . Numbers increased steadily going Geiger counter and leave the alarm. Reality has been destroyed this beautiful Japanese countryside landscape. Japanese anger as I felt indescribably tough staffing.
by e123 4/22/2011 9:33:57 AM
U.S. nuke expert stayed at Kan's official residence. - www.asahi.com
by hudebnik 4/22/2011 9:34:16 AM
by e123 4/22/2011 9:35:15 AM
by e123 4/22/2011 9:36:11 AM
TEPCO to delay start of new Higashidori reactors - www.yomiuri.co.jp
by hudebnik 4/22/2011 9:43:46 AM
by e123 4/22/2011 9:45:19 AM
@e123 wow... unbelievable- thank you for sharing
by janet-k 4/22/2011 9:59:30 AM
by e123 4/22/2011 10:13:32 AM
Major updates are as follows.1. Nuclear Power Stations (NPSs) Fukushima Dai-ichi NPS- Videotaping using a wireless helicopter was carried out in order tograsp the situations of the reactor building for Units 1 to 4(11:43-12:50, April 21st). www.nisa.meti.go.jp
@e123 Crikey! Thanks for bringing these here. Hats off to these guys - clearly risking arrest and/or cancer, so very brave. I've no idea what all the numbers mean though (on a scale of ohshitness). Maybe someone could kindly quantify for us? Intersting also to see how the numbers stack up against the 'official figures' being put out?
by Paul 4/22/2011 11:01:30 AM
This just struck me as odd - just now measuring. * From April 22nd, we will install the thermocouple-type thermometer and the radiation dose meter to the concrete pumping vehicle at the spent fuel pool of Unit 4 and we will investigate the water level of pool, water temperature, radiation dose, water analysis etc. www.tepco.co.jp
by Scilla 4/22/2011 11:13:04 AM
Someone take a look at teppycam and see if you notice a line of glow by the glow dot? I've noticed it the last couple of days.
by marie rich 4/22/2011 11:26:29 AM
@elainekirk Here is a link about fuel deliveries, including mox, to Japan: world-nuclear.org