@nancy the flooding maps are what the workers have been issued with !
As an important issue in the contaminated water Fukushima Daiichi nuclear power plant accident, JNN was created to call attention to workers in the field map "contaminated water" to get. High dose of water stop working, you can see piled up a lot of reality.
30 days, heavy rain also Fukushima. No smoking in the rain to see the buildings you will see the other side of the primary. According to TEPCO, which accumulated in reservoir water level throughout the morning on the premises 30 days, was called to see that the rise across the board.
"The (water) is greater than the rate of rise yesterday. Is not the influence of rain" (Press Office Hukuzima TEPCO Shortly after 9 am)
Is particularly worrying is the rise of the water is polluted water that contains high concentrations of radioactive material accumulated in the No. 2 and No. 3. Twice so far, have been found to have leaked out into the sea.
"Dari loaded with sandbags, and a blue seat cover, are doing to prevent the influx of rainwater" (press office Hukushima TEPCO Shortly after 9 am)
Contaminated water continue to grow. In addition to being injected into the leaking water reactor, has also increased water levels affect the ground water and rain.
Discourage large amounts of contaminated water for recovery, JNN is a summary for the distribution of workers in the field "pollution map" to obtain. Last week, "Kaname Shigeru isolation facility" which was posted, if you work around the water is said to have warned that always wear rubber boots.
The map focused on waste disposal from Unit 1 and Unit 6 has been described in detail so far have confirmed the situation. Unit 4 turbine building basement is completely blue. You can see that for almost submerged. Further.
[No. 1]
"More than 1000 mSv dose"
- Unit 3 turbine building;
"Red Water"
Unit 3 - building waste treatment;
"Where I can hear the sound of water flow can not be confirmed"
TEPCO 30, two employees of the 30s and 40s, to show that there is more than likely exposed to radiation dose limit of 250 mSv. The two men in charge of the No. 3 and No. 4, was referred to consult the work in the central control room before and after March 14 there was an explosion in the No. 3. (30 18:09)
news.tbs.co.jpand it is radioactive and not from the rain