
@Ralph Unger I also found something from earlier on that "roadmap" TEPCO put out. They comment that the #4 SFP needs to be propped up. Large parts of the building are gone and the thin stretch of concrete that tied it to the outer structure is likely damaged. The way the SFP is designed and tied into the structure would have gotten me a big fat F in drafting class. How it was ever approved is beyond me. Look at the right side elevation drawing www.houseoffoust.com

@Maureen Burke Hi! www.houseoffoust.com

The MEXT SPEED1 page at www.bousai.ne.jp shows Ibaraki "under survey"; I am unable to verify if this was also the case yesterday but it seemed to be OK on the 23rd. Thanks.