@es the regulations said one back up and the authorities have ordered that "Therefore, the interpretation was
amended to require two emergency generating facilities operable which
connect to necessary emergency alternate-current high-voltage bus line for
each nuclear reactor (when power stations have more than one nuclear
reactor, they can count the number of emergency generating facilities of
other units which are connected to the necessary emergency
alternate-current high-voltage bus line.)
Maybe Tepco got confused
by elainekirk 4/29/2011 11:11:25 PM

@general Nancy's collection is second to none imho go have a good browse through her collection
by elainekirk 4/29/2011 11:15:26 PM

@general I am not sure there was an order in 2006 for all plants to carry our seismic testing etc to ensure their plants met tighter controls re quake/tsunami the stipulations included I believe ensuring the fuel for back up generators was protected, as Tepco had the deisel tanks ppractically sitting on the jetty then I doubt it. However it is a mute point as they requested and were granted extentions re actually getting the studies done
by elainekirk 4/29/2011 11:23:35 PM

@talisker she isnt married to some chap called busby is she, I can see it now
"Oh look dear a new disaster we can milk which side do you want to take?"
"well darling I rather fancy ripping the pro nukes off I fancy the challenge"
"ok darling I will go do the scaremongering role...more coffee before we start?"
by elainekirk 4/29/2011 11:44:07 PM

back for a bit
by dean 4/29/2011 11:44:29 PM

@dean how nice to see you I was contemplating coffee
by elainekirk 4/29/2011 11:45:07 PM

splendid idea elaine
by dean 4/29/2011 11:45:28 PM

Lets go back to technical these pocket lining self appointed guardians are upsetting my equalibrium UI need coffee
by elainekirk 4/29/2011 11:52:34 PM


www2.jnes.go.jp this one is Daiichi and another case of them not keeping up to date www2.jnes.go.jp . There were two power supply systems for redundancy, but neither of them was supplied source electric power at that time.
Detailed investigations on both of these power supply systems have further revealed galling at the contact points between the leaf spring and terminal in the fuse holder and also the adhesion around there of powders with high electric resistance produced by their oxidization.
No fault was recognized for the other components in the inverter, or the pump or its motor.


www2.jnes.go.jp Today (on February 25, 2009), the turbine bypass valve (*1) fully closed at approximately 13% reactor thermal power. Thus the reactor pressure increased to approximately 7.1MPa (rated pressure: 6.86MPa) and the safety relief valve opened. Consequently the reactor power decreased by means of insertion of the control rods. www2.jnes.go.jp Even though the loosening prevention nut (locknut) has been fixed on the screw part, the regular inspection on the concerned part has not been carried out. The simulation test results showed that if the fastening of the locknut was insufficient, attrition would occur at the screw part. It was therefore estimated that the locknut was not fastened sufficiently when the concerned connection was replaced during the second periodic inspection, and afterwards the regular inspection of the concerned connection haven’t been carried out, and thus insufficient fastening of the locknut was not be found and the screw part fell off.