putting both links up top as a pinned item. Please share these widely with some background on what has been going on. I plan to write up on both of these and the surrounding nonsense as an article tonight. Let me know if there is something you think I need to point out or add to it.
by lillymunster 12/15/2011 6:36:41 PM

@MaryW downloading to my hard drive right now. Let me know if there is anyone I should send copies to when done.
by lillymunster 12/15/2011 6:54:02 PM

Vacuum cleaner dust from houses around Japan tested by ACRO, lots of scary high house dust of course worse as you get into Fukushima
www.acro.eu.orgby lillymunster 12/15/2011 7:15:34 PM

@artnuke jackhammer cranes. TEPCO even had a hand out with pictures of the process. I posted it later in the day yesterday.
by lillymunster 12/15/2011 7:58:01 PM

this has links to the TEPCO photos of the work
ex-skf.blogspot.comby lillymunster 12/15/2011 7:58:58 PM

TEPCO was #8 on Google Zeitgeist search list of the year. Beat out Steve Jobs
www.theverge.comby lillymunster 12/15/2011 8:00:40 PM



@MaryW well that maybe, but they have to take measures to contain the radioactivity. i would prefer seeing tents on #3 and 4 as well.
by Edano 12/15/2011 8:21:42 PM

@MaryW but i don't see an alternative to the tents.
by Edano 12/15/2011 8:29:30 PM

i still wonder how they want to scrap the plants. this is almost impossible, i would have thought. they have to invent entire new technology for this. if it really works, they can afterwards continue with chernobyl.
by Edano 12/15/2011 8:36:53 PM

... and the next, coming ruin. we will surely see another catastrophe before fuku is scrapped.
by Edano 12/15/2011 8:38:27 PM

@Edano I think they have illusions it will be like TMI and removing the fuel. I think what they really will find down there won't be quite so tidy. Once they get cameras in the building I expect the decommissioning to be projected past 40 years. Once all the fuel is removed it will be a matter of dismantling I am guessing they will chew them apart from the top down. Keeping parts of 3 and 4 from falling down as they do this will be dangerous.
by lillymunster 12/15/2011 8:46:28 PM

@lillymunster i have no idea how to remove 20m³ corium each.
by Edano 12/15/2011 8:47:59 PM

... eaten deep into concrete.
by Edano 12/15/2011 8:49:24 PM

@Edano neither does TEPCO. It hasn't been done
by lillymunster 12/15/2011 8:50:18 PM

they have to cut it in pieces underwater by robots.
by Edano 12/15/2011 8:52:23 PM

and lift it up thru the bottleneck.
by Edano 12/15/2011 8:54:15 PM

The Beyond Nuclear petition to suspend all GE BWR reactors has been fully rejected by the NRC. Their claim is that all parts not already in the Fukushima Task force review are without merit and those included in the task force review are being handled through that process. So they won't suspend any units and will let them run as the task force takes however long. I have the full very long letter if anyone wants it. NRC sent it as email
by lillymunster 12/15/2011 9:17:55 PM

Daini evac zone will be ended at end of December
ex-skf.blogspot.comby lillymunster 12/15/2011 9:24:02 PM

by lillymunster 12/15/2011 9:50:11 PM

NRC APPROVES PRIORITIZATION OF JAPAN LESSONS-LEARNED
TASK FORCE RECOMMENDATIONS
The Nuclear Regulatory Commission has approved the agency staff’s prioritization of the Near-Term Task Force recommendations on lessons learned from the Fukushima Dai’ichi nuclear incident and supports action on the Tier 1 and Tier 2 recommendations.
Tier 1 recommendations are those Task Force recommendations the staff determined could be implemented without unnecessary delay and for which sufficient resources are available. Tier 2 includes recommendations that cannot be initiated in the near term due to factors that include the need for further technical assessment and alignment, dependence on Tier
1 issues, or availability of critical skill sets. The staff’s prioritization was provided to the Commission in staff paper SECY 11-0137.
In a Staff Requirements Memorandum (SRM) issued today, the Commission directed the staff to prepare notation vote papers for its consideration when proposing orders to impose new safety requirements on the nation’s nuclear power plants.
“In approving the prioritization, the Commission has taken an important next step in responding to and implementing the safety recommendations of the Task Force,” said NRC Chairman Gregory B. Jaczko.
The Commission also directed the staff to determine whether any regulatory action is required on additional issues identified by the staff as relevant to the Fukushima Dai’ichi crisis.
On one of those issues – filtration of containment vents in reactors – the Commission directed the staff to merge it with the Tier 1 action on hardened vents for Mark I and Mark II reactor containments.
Under the SRM, the staff is to provide the Commission within nine months its evaluation of the schedule and milestones, resources, and implementation challenges for the Tier 3 recommendations, those that require further staff study or are dependent on completion of an
associated short-term action. sent by NRC email in the last hour
by lillymunster 12/15/2011 11:09:30 PM

Staff requirements document from that letter below
www.nrc.gov Prioritization document
www.nrc.govby lillymunster 12/15/2011 11:11:07 PM

TIER 1: To be undertaken without undue delay.
2.1 Seismic and flood hazard reevaluations
2.3 Seismic and flood walkdowns
4.1 Station blackout (SBO) regulatory actions
4.2 Equipment covered under Title 10 of the Code of Federal Regulations (10 CFR)
50.54(hh)(2)
5.1 Reliable hardened vents for Mark I and Mark II containments
7.1 SFP instrumentation
8 Strengthening and integration of emergency operating procedures, severe
accident management guidelines (SAMGs), and extensive damage mitigation
guidelines
9.3 Emergency preparedness regulatory actions (staffing and communications)
by lillymunster 12/15/2011 11:16:59 PM

Tier 2. The second tier consists of those NTTF recommendations which could not be initiated in the near term due to factors that include the need for further technical assessment and alignment, dependence on Tier 1 issues, or availability of critical skill sets. These actions do not require long-term study and can be initiated when sufficient technical information and applicable resources become available.
The Tier 2 recommendations are the following:
7 SFP makeup capability (7.2, 7.3, 7.4, and 7.5)
9.3 Emergency preparedness regulatory actions (the remaining portions of
Recommendation 9.3, with the exception of Emergency Response Data System (ERDS) capability addressed in Tier 3)
by lillymunster 12/15/2011 11:18:05 PM

Tier 3 are item that require more study or are dependent on other actions in tier 2 or 1.
2.2 Ten-year confirmation of seismic and flooding hazards (dependent on
Recommendation 2.1)
3 Potential enhancements to the capability to prevent or mitigate seismicallyinduced fires and floods (long-term evaluation)
5.2 Reliable hardened vents for other containment designs (long-term evaluation)
6 Hydrogen control and mitigation inside containment or in other buildings (longterm evaluation)
9.1/9.2 Emergency preparedness (EP) enhancements for prolonged SBO and multiunit
events (dependent on availability of critical skill sets)
9.3 ERDS capability (related to long-term evaluation Recommendation 10)
10 Additional EP topics for prolonged SBO and multiunit events (long-term
evaluation)
11 EP topics for decision-making, radiation monitoring, and public education (longterm evaluation)
12.1 Reactor Oversight Process modifications to reflect the recommended defense-indepth framework (dependent on Recommendation 1)
12.2 Staff training on severe accidents and resident inspector training on SAMGs
(dependent on Recommendation 8)
by lillymunster 12/15/2011 11:20:02 PM

Additional recommendations that were not in the initial task force report but staff were concerned about and want more review or action on these:
Filtration of containment vents
Instrumentation for seismic monitoring
Basis of emergency planning zone size
Prestaging of potassium iodide beyond 10 miles
Transfer of spent fuel to dry cask storage
Loss of ultimate heat sink
They say these are incomplete and more will come as Fukushima is further understood.
by lillymunster 12/15/2011 11:21:35 PM

They want to apply the general concepts of these to new reactor approval process. They also mention they need funding for these additional activities. I am sure that will be another Congressional slap fight.
by lillymunster 12/15/2011 11:24:13 PM

www.japantoday.com Yakuza involved in Fukushima clean-up: reporter
by lillymunster 12/16/2011 1:14:43 AM

i think it is snowing on teppycam ...
by Edano 12/16/2011 1:22:51 AM

TEPCO won't release treated water to sea for nowThe operator of the crippled Fukushima Daiichi nuclear power plant has decided for the time being not to release decontaminated water into the ocean.
Tokyo Electric Power Company, or TEPCO is decontaminating radioactive water amassed in the basements of the reactor buildings and then recycling it as coolant for the reactors.
But it is having difficulty dealing with the decontaminated water. Amounts are exceeding the initial estimates and underground water is also flowing into the basements. Currently, the firm is storing the treated water in tanks on the plant's premises.
TEPCO said on December 8th that it was considering discharging the treated water into the sea after further decontaminating it.
However, it has postponed its decision after facing a protest from a national association of fisheries cooperatives.
TEPCO disclosed its position in a 3-year management plan for its nuclear plants presented to the industry ministry's Nuclear and Industrial Safety Agency on Thursday.
The firm says it will not release water into the sea until it implements 3 measures: blocking underground water from entering the basements, improving and stably operating decontaminating equipment, and increasing the number of storage tanks.
TEPCO says it will not release water into the ocean without approval from relevant government offices, including the fisheries ministry.
A TEPCO senior official says his firm will explain its efforts in detail to relevant organizations after taking the 3 steps. He says TEPCO will also properly brief the national fisheries association and local fishermen on its plan.
Friday, December 16, 2011 07:41 +0900 (JST)
www3.nhk.or.jp by Edano 12/16/2011 1:25:58 AM