very nice photo Debra... in just 26 hours
by dean 4/16/2011 10:53:23 PM

ty Nancy.. I'll do the best I can without a blue print of the way the steam dryer mounts into the reactor on the bottom.. I would think that there would be a mechanical attachment, then the reactor vessel top has a series of studs that the top head is lowered onto, then the many many nuts on the studs... some sore of machine that is like a SPANNER WRENCH to sequentially tighten the nuts on the studs ... then the yellow concrete containment cap with I think we've learned is a solid connection to the containment.. it has to withstand some where around 70 pounds. and finally the top caps.. so,,, I don't see the yellow cap being ploped.. however, if an explosion of the magnitude that we've seen happen it could blow the top of the reactor vessel off and then push up the yellow cap and top cover..
by dean 4/16/2011 11:31:23 PM

Nancy.. from what we've learned do we think the yellow dome and reactor top head have been blown ott.. and the top plate..
by dean 4/16/2011 11:31:54 PM

Nancy.. in most facilities ,, well at least the reactor I worked at had floor loading areas... there were lift height requirements and areas where loads could not be moved over those areas... as such.. every piece of hardware that came out.. had a designated place to store.. some times for convience , some times for the order taken off.. or other times for rad controls... I suspect it's the same at those reactors..
by dean 4/16/2011 11:39:40 PM

we always had a main floor storage map that went with work orders to off load things
by dean 4/16/2011 11:40:39 PM

nancy.. from various photos we should see the same spots for the components.. however, there may be a difference between #2 and 3 and 4 as they were changed some on the floor plan as apposed to #1
by dean 4/16/2011 11:42:23 PM

Nancy.. some link that had the blue print of #1 also has an explanation of how the others are different..
by dean 4/16/2011 11:45:40 PM

from that write up .. what was done..the location of the heads etc. could be different
by dean 4/16/2011 11:48:30 PM

yes... it has to be able to move above the vessel to be directly above the fuel or other hardware removed like the shroud
by dean 4/16/2011 11:49:26 PM

I need to take a break.. dinner time.