  • @xxx thank you for loading this for us! I couldn't open these videos on the tepco site.
    by Scilla 4/20/2011 4:19:51 PM

  • fitter, Dean may have good thoughts on www.jsme.or.jp the mechanical stuff I don't have much opinion on one way or the other. In the conclusions I noted "very cost-effective" which is normally a flag to see if what they suggest is really superior or simply a way to save $ (the two are not necessarily mutually exclusive).
    by Markfm 4/20/2011 4:20:21 PM

  • @Scilla unfortunatly quality is so bad, they recorded this from laptop screen instead upload files from robots cameras
    by xxx 4/20/2011 4:21:12 PM

  • I guess they don't believe in screen-capture video utilities, we use them all the time.
    by Markfm 4/20/2011 4:24:00 PM

  • Just come across it and find interesting Citizen Monitors Keep A Wary Eye On Radiation And Government www.cemp.dri.edu
    by Majjham Zazen 4/20/2011 4:24:18 PM

  • @Markfm it should be possible to save video from robot camera directly
    by xxx 4/20/2011 4:24:56 PM

  • by xxx 4/20/2011 4:25:34 PM

  • @elainekirk You may have this, but "Fukushima Leaks 30 Years of Lies" translate.google.com
    by Reed edited by elainekirk 4/20/2011 4:28:39 PM

  • good read Tenzing on that source term doc
    by dean 4/20/2011 4:29:32 PM

  • xxx -- Absolutely. The laptop is receiving the stream, it should be getting directly recorded on the laptop. It's a farce -- a video of a laptop displaying a digital video stream, then even that video is output at 320x180, since the original (the camera taking the video of the laptop) was likely at least a 640x360, and most probably 1280x720. I don't know what the original stream displayed on the laptop is, but it will be fairly good -- you can do wonders with a 1 Mbps video, quality-wise, these days.
    by Markfm edited by Markfm 4/20/2011 4:30:11 PM

  • @dean went to see if i could find the link i was for teziing, but if you have a minute and have never seen the photos of the "head degreration" they are quite shocking even to me and i am used to /stee'pipe deteriation www.nrc.gov www.nrc.gov be right back lost the link
    by fitter 4/20/2011 4:30:24 PM

  • @dean link to the pics of the www.nrc.gov major computor problems to day
    by fitter 4/20/2011 4:33:23 PM

  • @dean does anyone have any ideal why my post shows up different that what i have typed in the box.. it woun't show all the words or some have a differnet link ... but when i went on the site and clicked it is showed the correct site.. can the post get blended as they come on??
    by fitter 4/20/2011 4:36:06 PM

  • the reactor 1 video is very short...
    by xxx 4/20/2011 4:36:59 PM

  • by xxx 4/20/2011 4:37:01 PM

  • The NISA report 104 does translate okay translate.google.com if anyone is interested.
    by Markfm 4/20/2011 4:37:17 PM

  • fitter, anything is possible -- I have to click "refresh" on my browser periodically, to clear up oddities.
    by Markfm 4/20/2011 4:38:00 PM

  • by xxx 4/20/2011 4:38:29 PM

  • Nuke workers at risk of overwork death search.japantimes.co.jp
    by Markfm 4/20/2011 4:40:12 PM

  • Jaitapur Project: Ratnagiri situation still tense, but under control Ratnagiri , Wed, 20 Apr 2011 ANI The situation is still tense but under control in Maharashtra's Ratnagiri district, where a shutdown was called by Shiv Sena on Tuesday to condemn police firing in which one person was killed while opposing the 9,900 MW Jaitapur Nuclear Power Project (JNPP). The nuclear project at Jaitapur, which would be built in collaboration with French firm Areva, has run into rough weather as protesters have argued that it would harm the local environment and put people at risk.

    The project site is 25 meters above sea level. In the wake of the nuclear crisis in Japan, India is planning urgent steps to review safety norms in its nuclear power plants in case of any eventuality and to withstand natural disasters of the magnitude as witnessed in Japan.

    India has 20 nuclear reactors in operation in six power plants, generating over 4,000 megawatts of electricity while five other plants are under construction. www.newstrackindia.com
    by Tenzing 4/20/2011 4:41:05 PM

  • @tenzing i am going to try rebooting, but it was the NRC site under efflunet and enviromental reports... i could not find it again.. but it was quite informative and shocking if you live in the 10 mile ring
    by fitter 4/20/2011 4:41:35 PM

  • checking those fitter.. my lap top needs a thump..
    by dean 4/20/2011 4:41:39 PM

  • @dean same here
    by fitter 4/20/2011 4:41:59 PM

  • Kan to make 20-km no-entry zone binding search.japantimes.co.jp "the water level of another trench connected to the reactor 3 turbine building is edging up, the Nuclear and Industrial Safety Agency said."
    by Markfm 4/20/2011 4:42:28 PM

  • @dean BTW in the one pic they do not have thier bottles tied off according to OSHA....
    by fitter 4/20/2011 4:43:16 PM

  • @reed have you put the 30yrs link into the wiki so it doesnt get lost
    ?
    by elainekirk 4/20/2011 4:43:41 PM

  • A week ago sunday, the trench level was 92cm to top now its 108cm.....they really have not made progress !!
    by VeenOui 4/20/2011 4:43:52 PM

  • Asia nuclear reactors face deadly tsunami risk search.japantimes.co.jp
    by Markfm 4/20/2011 4:44:17 PM

  • @veenoui how stupid do they think people are ???
    by elainekirk 4/20/2011 4:45:36 PM

  • On Unit 2 trench, I see reports of either 1 or 2 cm drop due to the first day's work, depending on NHK vs. JT. Gonna take some time...
    by Markfm 4/20/2011 4:46:25 PM

  • @elainekirk if you are crusing the NRC web page they had a detailed report on the reactors bodies and heads... and the issues with the forgings not be correct.. i try finding it again but could'nt, i know its in the section on "conterfiet" parts... just in case your interested.. yoiu find alot
    by fitter 4/20/2011 4:46:54 PM

  • fitter.. I have so much to talk to you about. .dang.. my fingers will be tired.. whewwwww...
    by dean 4/20/2011 4:48:25 PM

  • we need to get that skype thing some time.. we talked about it with George and Jim... haven't heard much since then... I wanted to discuss the efforts industry is taking to prolong life or alter the original design of the facility for the purposes of saving money.. all that stuff in my mind.. puts one outside the original design basis
    by dean 4/20/2011 4:49:52 PM

  • U.S. Engineers Cite Lengthy Cleanup in Japan www.nytimes.com
    by Markfm 4/20/2011 4:51:01 PM

  • @dean i will learn skype if i don't have to type... I'm give me a pencil/pic.. and talk about it person
    by fitter 4/20/2011 4:51:18 PM

  • the photo's you linked me definately show areas of concern for BWR's,, one thing is .. they cut costs by building the vessel out of carbon steel then have a stinless steel liner,, which introduces all kinds of stress questions... and, in most cases.. remember,, every component in the vessel has a "fluence limit" ie: how long can it operate until it reaches a limit from stress, fatigue, corrosion etc. the longer the plant goes.. they keep updating the life time projection with more analysis and paperwork ,, ,but in fact... in my opinion the components should be replaced instead of bandaid fix's.. which result in running with known cracks like in the shroud
    by dean 4/20/2011 4:52:39 PM

  • @elainekirk The question is not how they did it BUT, they cyphened what 1 day ? or three at the most....so what happened to all the rest of the water difference ?
    by VeenOui 4/20/2011 4:53:07 PM

  • @dean did you see the response from Domino Power.... after i went to the links.... i actual wonder if i did right by living here and rasing a family
    by fitter 4/20/2011 4:53:11 PM

  • yep me too fitter... I have talked to jim and George and would be receptive to talking with anyone.. 5 min conversation can cover a huge area of texting and pounding pc's..
    by dean 4/20/2011 4:54:19 PM

  • I didn't see the response fitter..
    by dean 4/20/2011 4:54:39 PM

  • @dean i did a lot of looking at the repairs to stress cracks etc... wouldn't fly on a piping system... really don't understand... but no way these plants should be re-issued 20 more years
    by fitter 4/20/2011 4:54:40 PM

  • unfortunately .. it's big money.. I still wish all reactors were non profit
    by dean 4/20/2011 4:55:49 PM

  • another thing.. it's hard to find a vendor with an N-STAMP to fabricated nuclear components anymore.. they they have to do a commercial grade acceptance on material
    by dean 4/20/2011 4:56:13 PM

  • @dean my fingers are tired... they told me to turn my radio on listen for instruction, there are not set paramiters for the alarms. it may mean stay in place or evacuate.. they will brodcast.. if the power is out use the car radio.. and the set me to a bunch of web sites
    by fitter 4/20/2011 4:56:38 PM

  • fitter could you email me for a min.... at ^ email addy
    by dean 4/20/2011 4:57:40 PM

Japan Earthquake | Page 777

Who's Blogging
  • hudebnikhudebnik
  • albleealblee
  • UKValUKVal
  • Jonathan KeeblerJonathan Keebler
  • Oliver (ScribbleLive)Oliver (ScribbleLive)
  • kaykodhkaykodh
  • MarkfmMarkfm
  • AngieAngie
  • Mid ValleyMid Valley
  • Matt (ScribbleLive)Matt (ScribbleLive)
  • George GibbGeorge Gibb
  • elainekirkelainekirk
  • PKelleyPKelley
  • lillymunsterlillymunster
  • deandean
  • bobo
  • EdanoEdano
  • DebDeb
  • Pedro Jesus
  • IanGoddardIanGoddard