
sounds good jim. I'm loading a pdf for trial now .. then I need to go eat.. be back later
by dean 4/20/2011 10:59:33 PM

@northern cal I have copied it over
by elainekirk 4/20/2011 11:01:03 PM

@jim sounds very good somebody spent ages teaching me about clouds last year - I hear
the psychiatrist is hoping that she will recover from the experience
by elainekirk 4/20/2011 11:03:14 PM

@ rob just a mo I think i have list
by elainekirk 4/20/2011 11:04:04 PM

@scilla it is pinned at the top above you the translate link
by elainekirk 4/20/2011 11:12:07 PM

OH I will look nancy
by elainekirk 4/20/2011 11:17:04 PM

@nancy links are further down page for other
www.quickonlinetips.comby elainekirk 4/20/2011 11:26:21 PM

@jim and there was an ariva batch in '01 nd another batch by ship in '09 form france?
by elainekirk 4/20/2011 11:27:19 PM

@nancty did you find stats? reactor
by elainekirk 4/20/2011 11:31:31 PM

I am lost on them I will copy @Jo's assessment over
the water flow...
[Edit]2 is still a mess, not really under control: heating up again, water boiling in the RPV and the drywell, high radioactivity level everywhere; parameters still suggest the same conclusion: torus breached, free running fission in the drywell and fuel leaking out via the torus with
Another good thing: #1 drywell temperature is also nearly reaching the water boiling point (3 °C to go...).
[Edit]
by Jocelyn Mayer at 12:15 PM
#1 has good news too: 1 degree to the (low) water boiling temperature !
Another good new: the drywell temperature seem directly correlated to the RPV bottom temperature, seems always ~ 4°C above for the last 3 days; it seems them cooling down at the same speed as the RPV, which can mean there is now heat source in the drywell itself, then no active fuel there. The 4°C offset could then be explained by the drywell water thermal inertia.
note- about #1... my bad english... I meant (underlining the faulty parts):
"it seems _then_ cooling at the same speed as the RPV, which can mean there is _no_ heat source in the drywell itself"
Sorry...
by Jocelyn Mayer at 12:11 PM
#3: forgot: the 2 last torus CAMS reading show radioactivity is low there; seems like Tepco still have problems with units conversions: 10^1 is not the same as 10^-1 !
The last readings are consistent: torus radiation level nearly .5 Sv/h for the 2 CAMS sensors
by Jocelyn Mayer at 12:05 PM
Daily reactor data (from METI) are surprising; my reactor of the day: #3 !
#3: RPV pressure and temperatures are dropping; might reach cold shutdown state (ie temperature below 100 °C, atmospheric pressure) tomorrow or the next day. Unfortunately, the drywell is far from cold shutdown: atmospheric pressure, high temperature: likely to be breached, nuclear fission free running there.
by Jocelyn Mayer at 12
by elainekirk 4/20/2011 11:49:24 PM

@majam that is some amount of work you did there!!
by elainekirk 4/20/2011 11:55:30 PM