  • TEPCO Live Press Briefing (Japanese): www.ustream.tv
    by es 4/27/2011 2:04:52 AM

  • @Scilla Yes, utter desperation, they cannot find the leaks, so they are flooding it to be able to get it cooled down radiation down and send robots in
    by VeenOui 4/27/2011 2:06:14 AM

  • CTBTO data displaying recent increase in Iodine-131 concentrations in Japan. www.bfs.de

    by Bobby1 via Bfs.de 4/27/2011 2:16:19 AM

  • Cesium-137 also increasing. www.bfs.de

    by Bobby1 via Bfs.de 4/27/2011 2:17:15 AM

  • TEPCO are showing new video footage at the Live Press Briefing: www.ustream.tv
    by es 4/27/2011 2:17:41 AM

  • @Bobby Note that that graph is not at a normal scale, it is by powers of ten.
    by Ralph Unger 4/27/2011 2:28:44 AM

  • That minimalizes the high end spikes. On a normal graph they would go to the top of the building you were standing in if represented correctly.
    by Ralph Unger 4/27/2011 2:35:48 AM

  • @Ralph Unger Looks like both of them are up by a factor of ten or more.
    by Bobby1 4/27/2011 2:37:07 AM

  • Why do all the readings I get from TEPCO say that everything is OK and getting better when all other data says otherwise? www.tepco.co.jp www.mext.go.jp
    by Ralph Unger 4/27/2011 2:41:09 AM

  • @Ralph Unger That is simple, someone stole TEPCO's Blueprint, they have no idea anymore what's going on :-O
    by VeenOui 4/27/2011 2:42:04 AM

  • Reactor stats look pretty much the same as in fubar. atmc.jp
    by Ralph Unger 4/27/2011 2:46:16 AM

  • @Ralph Unger I am really concerned the flooding might cause a catastrophic failure. I understand why they want to try it but would really like to know what their back up plan is.
    by Nancy 4/27/2011 2:49:07 AM

  • So, Did Toshihiro present the Nancy blueprint at the TEPCO press conference on the 24th, to which they responded "Where did you get that?"

    Because that's what it sounds like...

    "TEPCO said at a news conference April 24 that the company suspects the blueprint is one of its internal documents, but has not confirmed how it was made public."

    www.asahi.com
    by Rob in SF 4/27/2011 2:49:15 AM

  • @Nancy @Ralph Unger We have been watching smoke pour out of #4 on a regular basis for the last 7-10 days. The flooding isn't improving the situation, in fact it may threaten the stability of the whole site.
    by Bobby1 4/27/2011 2:50:51 AM

  • @Nancy Run away? I cannot imagine a plan for major failure of SFP's or DW.
    by Ralph Unger 4/27/2011 2:51:06 AM

  • @Rob in SF Yep. The reporter talked to me briefly and took it to a press conference and confronted a TEPCO official with it.
    by Nancy 4/27/2011 2:53:07 AM

  • This still freaks me out no matter how many times I see it. atmc.jp
    by Ralph Unger 4/27/2011 2:53:46 AM

  • @Ralph Unger 4's SFP was leaking something around 120-150 TONS of water in a day or two. There has to be a huge hole. What is worrying me is that the hole is a crack in the wall holding the SFP to the outside of the containment structure.
    by Nancy 4/27/2011 2:54:36 AM

  • I think the leak is in the pneumatic seals in the doors, They lost pressure and debris may now be keeping them from sealing after pressure was restored.
    by Ralph Unger 4/27/2011 2:55:59 AM

  • Those doors in the US plants are now solid and do not need power to work. Happy thought for the day.
    by Ralph Unger 4/27/2011 2:58:59 AM

  • @Ralph Unger Do you know what caused the US plants to do that, well other than the obvious. Was there a NRC demand?
    by Nancy 4/27/2011 3:01:34 AM

  • I posted on the other page. Since I am on a roll pissing off Tepco here's another blueprint I found on google image search www.houseoffoust.com
    by Nancy 4/27/2011 3:02:29 AM

  • I have mentioned this before but perhaps I should mention it again. In order to remove fuel from the reactor they flood parts of the plant and they open doors so the fuel can be transferred underwater, those doors use a pneumatic seal to keep them shut. @Nancy GE required it of all plants, but they could only enforce it in the US.
    by Ralph Unger 4/27/2011 3:03:43 AM

  • As with re-enforcing the baffles and toroid and beefing up the venting. I believe that Fukushima did meet those upgrades. It is hard to find out.
    by Ralph Unger 4/27/2011 3:07:19 AM

  • @Ralph Unger from the images it looked like they filled the well up to the top with the gate open to the SFP. Does it take more than that?
    by Nancy 4/27/2011 3:08:04 AM

  • Gate open? That means flooding most of the plant between the reactor and the SFP's.
    by Ralph Unger 4/27/2011 3:09:10 AM

  • @Ralph Unger LOL what is between them?
    by Nancy 4/27/2011 3:10:54 AM

  • A corridor, but it does mean a lot more water that may leak out.
    by Ralph Unger 4/27/2011 3:11:40 AM

  • @Nancy - that pic of the reactor you just posted below is not a blueprint, its a sketch.
    by Lethbridgean 4/27/2011 3:13:14 AM

  • None of the pics I have seen show the plant to be in a fuel transfer condition. Just water in the SFP's and around the reactors.
    by Ralph Unger 4/27/2011 3:14:48 AM

  • @Nancy "Yep. The reporter talked to me briefly and took it to a press conference and confronted a TEPCO official with it."
    I'm so proud to know all y'all...
    by Rob in SF 4/27/2011 3:15:10 AM

  • I think the big plan is to flood the entire plant but they have too many leaks to do so now.
    by Ralph Unger 4/27/2011 3:16:37 AM

  • Nice shot of the turbine building in there. And this: R4 SFP. 2005
    by radioguy 4/27/2011 3:17:14 AM

  • by radioguy 4/27/2011 3:17:23 AM

  • by Rob in SF via Tepco.co.jp 4/27/2011 3:19:04 AM

  • by Rob in SF via Tepco.co.jp 4/27/2011 3:19:26 AM

  • by Rob in SF via Tepco.co.jp 4/27/2011 3:19:51 AM

  • by Rob in SF via Tepco.co.jp 4/27/2011 3:20:36 AM

  • by Rob in SF via Tepco.co.jp 4/27/2011 3:20:56 AM

  • <Payment of Temporary Compensation for damages caused by evacuation>
    We plan to establish “Fukushima Nuclear Compensation Office ”on April 28th, which will be the dedicated contact point for the matters related to the damages caused by the nuclear accident as well as temporary compensation.
    By the establishment of Fukushima Nuclear Compensation Office, please call the nearest TEPCO customer center.
    by Ralph Unger 4/27/2011 3:21:14 AM

  • Hello, I lost my farm can you help me? www.tepco.co.jp
    by Ralph Unger 4/27/2011 3:22:03 AM

  • www.tepco.co.jp
    Leakage check from electrical penetration.

    by Rob in SF via Tepco.co.jp 4/27/2011 3:22:03 AM

  • @Lethbridgean yes, technically it is a sketch.
    by Nancy 4/27/2011 3:22:40 AM

  • www.tepco.co.jp
    Check of leakage from the equipment hatch.

    by Rob in SF via Tepco.co.jp 4/27/2011 3:22:59 AM

  • @rob, are these all on one page somewhere?
    by Nancy 4/27/2011 3:23:14 AM

Japan Earthquake | Page 859

Who's Blogging
  • hudebnikhudebnik
  • albleealblee
  • UKValUKVal
  • Oliver (ScribbleLive)Oliver (ScribbleLive)
  • Jonathan KeeblerJonathan Keebler
  • kaykodhkaykodh
  • PKelleyPKelley
  • MarkfmMarkfm
  • AngieAngie
  • DebDeb
  • Mid ValleyMid Valley
  • Pedro Jesus
  • Matt (ScribbleLive)Matt (ScribbleLive)
  • George GibbGeorge Gibb
  • elainekirkelainekirk
  • lillymunsterlillymunster
  • deandean
  • bobo
  • EdanoEdano
  • IanGoddardIanGoddard