@es Ah the marriage was short
by elainekirk 4/26/2011 11:27:23 PM

@es they need the expertise but until they take tepco out of the drivers seat there isn't much hope of it being put to good use
by elainekirk 4/26/2011 11:34:00 PM

elaine.. the techis better get their calculators out... I'm trying to put together some information to loook at equivalency of explosion in #3 to TNT
by dean 4/26/2011 11:41:01 PM

@dean that sounds like fun ...and way out of my league :) but I will enjoy watching
by elainekirk 4/26/2011 11:42:02 PM

@reed there is much doubt that they acted in a timely manner in addressing the need for modifications to ensure the plant was able to withstand a strong quake/tsunami they knew new seismic studies were demanded of all plants in '06 and the '07 quake that took out another tepco plant led to the reforms being chased up but although the damaged plant was modified Tepco as far as I am aware never actually commenced work though they did do the surveys the results of which led @marie to comment... I wonder if I can find her observation I will go look :)
by elainekirk 4/26/2011 11:47:54 PM

hey ralph... and askwhy
by dean 4/26/2011 11:57:45 PM

elaine I posted a paragraph on the other site for a start point
by dean 4/26/2011 11:59:05 PM

@es a brilliant piece
by elainekirk 4/27/2011 12:05:30 AM

Reed, I had thought james had answered it... those pumps and all the gear at the service building were flooded, switchgear fried so they would have had a small amount of water from the service pool with no make up
by dean 4/27/2011 12:09:34 AM

@veenoui it is good what I am wondering is does it/where is it in respect of fault lines /north american plate?
by elainekirk 4/27/2011 12:10:57 AM

right Reed
by dean 4/27/2011 12:20:36 AM

the diesel fuel tanks were on the waterside and were washed away which would have created a problem even if the tsunami hadnt breeched defenses , if the power had gone
by elainekirk 4/27/2011 12:24:06 AM

the plants have to treat the ocean water and get it to a chemistry requirement to be used for the makeup pumps to the reactor system for makeup water ... Not quiet sure what all the diesels powered but one would think it would power the necessary safety related systems to provide water to the reactor and flow to cool, backed up with the BATTERIES... which is a good point.. most battery areas have have ventillation running to strip off the hydrogen from the batteries.. they have hydrogen detectors and some times fire suppression systems,,, but they can also have enough h2 to explode
by dean 4/27/2011 12:24:34 AM

dinner time.. will return
by dean 4/27/2011 12:29:06 AM

yw talisker
by dean 4/27/2011 12:29:10 AM

@reed this is the tepco year end 31st march 2010 report it is pdf and I cant copy paster but if you search fukushima the first result says that they are still carrying out seismic evaluations . They were asked to do this and report by Sept 2007, that was extended to March 2008 at their request and yet in 2010 they still havent completed the evaluations....
www.tepco.co.jpby elainekirk 4/27/2011 12:30:45 AM