@fitter, aside from the uniform building codes the reactor building would have to meet certain seismic requirements, wind loadings tornado etc. for the SEISMIC ZONE they are in as well as NUREG AND NRC requirements..
by dean 5/10/2011 1:47:57 AM

I am going to now have nightmares @Nancy great pics #3 looks like part of a horror moviie set
by elainekirk 5/10/2011 1:48:21 AM

venting systems that could have potential air activity would go through HEPA typefilters for labs etc and equipment or main air supply and exhaust would all be directed to the scrubbers and treatment HVAC systems then out the stack... there are probably some systems that vent directly outside
by dean 5/10/2011 1:49:55 AM

@ fitter.. most HVAC theory at nuc plants is to draw air from a non-rad area to a rad area then out the stack
by dean 5/10/2011 1:52:00 AM

@Nancy great work , I am now going to take to my bed and try not to have nightmares Goodnight all
by elainekirk 5/10/2011 1:53:46 AM

time for bed ...
by dean 5/10/2011 1:54:09 AM