Japan Earthquake | Page 2191

  • Nite edano

    Dean, no reference for where the others are either
    by lillymunster 8/20/2011 2:48:26 AM

  • @lilly.. my time for some rest as well, will return in the morning
    by dean 8/20/2011 2:53:44 AM

  • Nite all. Will get the report posted here in a bit
    by lillymunster 8/20/2011 3:01:18 AM

  • Report on the latest EQ and changes at the plant on the group website www.simplyinfo.org
    by lillymunster 8/20/2011 3:24:13 AM

  • Heading off to bed. Please say hi or post something if there has not been activity for an hour or so to keep the page active overnight.
    by lillymunster 8/20/2011 3:29:48 AM

  • Bump
    by Panserbjorne9 8/20/2011 4:25:36 AM

  • Beep Beep
    by M.I.A. 8/20/2011 4:59:35 AM

  • by Ian 8/20/2011 5:28:56 AM

  • The video is about Japanese citizens Tweeting about food radiation...
    by Ian 8/20/2011 5:29:29 AM

  • Radiation Defense Project, Nationwide Soil Testing Project : www.radiationdefense.jp
    by Ian 8/20/2011 5:32:56 AM

  • Tokyo Metropolitan Soil Testing MAP : doc.radiationdefense.jp Reports a soil-contamination level in the Tokyo Metro area at Chernobyl-exclusion level!
    by Ian 8/20/2011 5:38:13 AM

  • G'day @all
    by hudebnik 8/20/2011 6:41:48 AM

  • The Guardian in the UK has this near the top of the website and in the paper today

    Inside Fukushima – interactive guideEarlier this month, Kazuma Obara became the first photojournalist to gain unauthorised access to the power plant and produced an exclusive glimpse of life inside the facility
    by hudebnik 8/20/2011 6:42:36 AM

  • by hudebnik 8/20/2011 6:42:52 AM

  • This is Kazuma Obara's own web page



    kazumaobara.com
    by hudebnik 8/20/2011 6:49:48 AM

  • This is from the website:



    Five months since the Japanese nuclear disaster at the Fukushima Daiichi Nuclear Plant, timing of resolution is still unclear. The operating company, Tokyo Electric Power Company (TEPCO) continues to expose the Japanese population to unprecedented danger, refusing disclosure of key information and facts and preventing journalists' access to the inside of the compounds.

    This report is a first-hand witness, showing a glimpse of the workers' day inside at the Daiichi Nuclear Power Plant in the beginning of August 2011.

    Five months since the Japanese nuclear disaster at the Fukushima Daiichi Nuclear Plant, timing of resolution is still unclear. The operating company, Tokyo Electric Power Company (TEPCO) continues to expose the Japanese population to unprecedented danger, refusing disclosure of key information and facts and preventing journalists' access to the inside of the compounds.
    This report is a first-hand witness, showing a glimpse of the workers' day inside at the Daiichi Nuclear Power Plant in the beginning of August 2011.
    The headquarter building is situated 200m northwest of the No. 1 Reactor of the Fukushima Daiichi Nuclear Power Plant. In this building, I entered the area where the walls, the floors are covered in pink plastic sheets. A man passed by and his pocket Geiger counter dosimeter went off with high pitch beeps. In each of the rooms here, there are many signs of the radiation measurements. Most show a rather high measurement of above 15 micro sieverts/hour, though they are not from recent measurements. Some have not been updated since April.

    7:30am. The first work shift of the day starts for the group I accompanied that day. They work outside for one hour, then return to headquarter. One hour of break is given, but after they undergo irradiation screening, take off and put the protective gear back on, the actual break is merely half an hour. One hour of work, one hour of rest. This is repeated 3 times daily.

    At 9:30am when the second shift started, I joined them outside wearing the same protective gear. After wearing the mask for 20 minutes, I felt a piercing pain at the back of my nose. Breathing became difficult. Within 30 minutes the left side of my head was in pain. I wasn't sure if it was lack of oxygen or if the mask was put on too tight. After an hour, the pain was unbearable and I was desperately looking at taking the mask off.

    11:30am. The workers return from their second shift. Exhausted, they all lay down on the small mats laid on the floor. Where space is scarce, they lay in the corridors, sitting down and taking naps. Some look awfully young, with blushed cheeks. By now, the laughs and chatters of the early mornings were no longer heard. They seemed focused on trying to recover from the exhaustion.
    August 1st, TEPCO announced radiation of 10,000 milli sieverts/hour detected near the ventilations between No. 1 Reactor and No. 2 Reactor. (1.5 minutes would surpass the 250 milli sieverts maximum allowed exposure for workers). The workers were not told of this fact, not on that day, nor afterwards. Never mentioned.
    Five months on, there is no disclosure of who the workers are and the realities of the conditions they work in. Who are the unseen heroes that are risking their lives, fighting and protecting the safety for the rest of the population? Are the conditions they work in ensured for effective work? Are the safety of these workers guaranteed? Are they well protected? Or are they merely treated as a disposable workforce? This is what I wanted to know. Anonymous reporting has been the only way news media can reveal these facts to the public. Non disclosure has become the norm for these people, their identities hidden when they are fighting to protect our safety.
    by hudebnik 8/20/2011 6:51:15 AM

  • G'morning @all
    @Edano Thanks for the continued number crunching and analysis :)
    Re temp increases in #3. This article mentions TEPCO's recent work to reduce the amount of water being injected into the core of Unit 3 from nine to six tons per hour: www.47news.jp
    by es 8/20/2011 7:07:56 AM

  • good morning just checking in missing these boards but have been watching will be home tonight to read all links have a good day say hi to organise board for me :)
    by ElaineKirk 8/20/2011 7:42:51 AM

  • More on the 'impervious wall' being built underneath Dai-ichi to prevent groundwater mixing with the contaminated waste water: news.tbs.co.jp
    by es 8/20/2011 9:05:07 AM

  • www.tepco.co.jp
    New images from TEPCO of the Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station [20 Auguat, 2011]

    by es via Tepco.co.jp 8/20/2011 10:27:33 AM

  • www.tepco.co.jp
    Reverse Osmosis Membrane Facility Unit

    by es via Tepco.co.jp 8/20/2011 10:27:45 AM

  • www.tepco.co.jp
    Auxiliary Machine (Control) Unit

    by es via Tepco.co.jp 8/20/2011 10:27:54 AM

  • www.tepco.co.jp
    Concentrated Water Tank Unit

    by es via Tepco.co.jp 8/20/2011 10:28:02 AM

  • by Majj 8/20/2011 10:45:50 AM

  • seems they built a lot of the magaical curtain support structure today.
    by Edano 8/20/2011 11:08:01 AM

  • (teppycam)
    by Edano 8/20/2011 11:08:10 AM

  • #1 all temps below 100°.
    by Edano 8/20/2011 11:15:38 AM

  • @Edano Hi. Yes, the new part of the structure we can now see was manouvered into place around midday 2011-08-20 (JST)
    by es 8/20/2011 11:17:38 AM

  • Link to an article I wrote: australiancannonball.com
    by AustralianCannonball 8/20/2011 11:43:21 AM

  • by Edano 8/20/2011 11:45:42 AM

  • @Edano ;)
    by es 8/20/2011 11:46:59 AM

  • really interesting.
    by Edano 8/20/2011 11:48:52 AM

  • @Edano Magical!
    by es 8/20/2011 11:50:19 AM

  • www.tepco.co.jp
    Pre-Treatment Unit for the Desalting Facilities for Spent Fuel Pool at Unit 4, Fukushima Daiichi Nuclear Power Station
    (pictured on August 17, 2011)

    by es via Tepco.co.jp 8/20/2011 12:34:38 PM

  • by alphaspheric 8/20/2011 12:40:06 PM

  • Morning all (afternoon - evening)
    by lillymunster 8/20/2011 12:46:02 PM

  • Great video @alphaspheric. Looks like some pretty high-precision work there with the mega-crane. Thanks.
    by es 8/20/2011 12:47:18 PM

  • back and good morning to all
    by dean 8/20/2011 12:49:08 PM

  • @ Edano, I left shortly after you so today I will try to research the locations of the rad detectors. I know they have some information about the instrumentation in the TSR's for plants so I will begin there. there is a section in the facility safety analysis report also that talks about instrumentation
    by dean 8/20/2011 12:53:08 PM

  • @dean let me know what you find. I may be able to create some illustrations including that information so people can visualize all of this.

    Something I noticed this morning while reading an article. The US considered evacuating all citizens in Tokyo and some of the military based on the early drone fly overs that did heat images. With all of our new knowledge is there anything useful in going back through the heat images? I saved copies of most of them.
    by lillymunster 8/20/2011 12:55:27 PM

  • @dean : been thinking of the corium crust cracking theory. if it is true, there is hardly a chance of solidifying, because the earthquakes will never cease.
    by Edano 8/20/2011 12:59:54 PM

  • @Edano I agree, some research on the theory will need to be done yet. I had the idea by treating the corium the same as lava flow's and we've all see where the surface color changes to black and then as it's moved can glow red again.
    by dean 8/20/2011 1:01:32 PM

  • @ lilly.. will do.. I belive off the top of my head we're looking for section 15 of the safety analysis report which describes the bwr instrumentation in detail
    by dean 8/20/2011 1:02:39 PM

  • @dean we can rule out that a rad sensor simply reacts on movements of the building, right ?
    by Edano 8/20/2011 1:05:29 PM

  • it should be technically impossible.
    by Edano 8/20/2011 1:08:14 PM

Japan Earthquake | Page 2191

Who's Blogging
  • hudebnikhudebnik
  • albleealblee
  • UKValUKVal
  • Oliver (ScribbleLive)Oliver (ScribbleLive)
  • Jonathan KeeblerJonathan Keebler
  • kaykodhkaykodh
  • PKelleyPKelley
  • MarkfmMarkfm
  • AngieAngie
  • DebDeb
  • Mid ValleyMid Valley
  • Pedro Jesus
  • Matt (ScribbleLive)Matt (ScribbleLive)
  • George GibbGeorge Gibb
  • elainekirkelainekirk
  • lillymunsterlillymunster
  • deandean
  • bobo
  • EdanoEdano
  • IanGoddardIanGoddard