Japan Earthquake | Page 745

  • @ALBLEE That would be interesting, but only easy if the globalincident map gives back dating, because the USGS site, while comprehensive, is not nearly as useful a visual format for pattern discernment. Of course, typical of most government sites, that tool may well be there and hidden somewhere down in SectionC sub1, sub a of some page ;)

    [Yeah, right, @radioguy. I was thinking that, if there was a tool to compare swarm patterns across various timeslices, then the USGS would probably have it, and these guys would be ringing alarm bells if warranted. But that doesn't mean we are being concerned over nothing. - Alblee]
    by radioguy edited by alblee 4/18/2011 4:46:35 AM

  • 2.5 near Mt Ranier seconds ago.
    by DonnerT 4/18/2011 4:52:02 AM

  • Gov't under fire for disaster response; TEPCO chief heckled in Diet
    Monday 18th April, 12:15 PM JST www.japantoday.com
    by gabe 4/18/2011 4:52:33 AM

  • @radioguy and all the earthquakes are normal nothing has increased, it is just you are paying attention now. earthquake.usgs.gov
    by gabe 4/18/2011 4:58:55 AM

  • Intelliquest weather has an earthquake function. I'll try to link to it. <a src="http://www.intellicast.com/Local/WxMap.aspx"></a>
    by DonnerT 4/18/2011 4:59:17 AM

  • by DonnerT 4/18/2011 5:00:00 AM

  • Thanks, @gabe, true, no debate on that, on an across the board basis. But might there be something in the swarm patterns, if any, that's worth reading some meaning into?
    > ... the earthquakes are normal nothing has increased, it is just you are paying attention now.
    .
    by ALBLEE 4/18/2011 5:03:42 AM

  • @radioguy a few web pages to look at earthquakes with different date ranges, you'll need to play with them a bit to get data www.emsc-csem.org earthquake.usgs.gov www.iris.edu
    by RonD edited by elainekirk 4/18/2011 5:05:45 AM

  • @ALBLEE If we here are able to discern patterns then we may get the Nobel Prize. I have my hands full keeping up with Fukushima though. :-/
    by gabe 4/18/2011 5:08:15 AM

  • @ALBLEE debra on other scribble has been making charts, just posted some over there.

    [Thanks, @Sinth. Thanks for the shuttle between scribbles. - Alblee]
    .
    by Sinthia Domina edited by alblee 4/18/2011 5:10:39 AM

  • @RonD Thanks, I will when I get some time... probably after sleep. How I don't sleep through the West Coast falling into the ocean. ;)
    by radioguy 4/18/2011 5:17:55 AM

  • @RonD Excellent, btw. I know this stuff had to be there. :)
    by radioguy 4/18/2011 5:18:49 AM

  • @radioguy google and "interactive earthquake map" does most of the work
    by RonD 4/18/2011 5:26:06 AM

  • TEPCO Releases Report on Tsunami that Hit Fukushima NPS:Height of Wave Three Times Higher than Projected in Plant DesignOn April 9, the Tokyo Electric Power Co., Inc. (TEPCO) released a detailed report onthe tsunami that struck its Fukushima Daiichi and Daini Nuclear Power Stations (NPSs)following the Great East Japan Earthquake of March 11.At the heavily-damaged Fukushima Daiichi NPS, the inundation height from base sealevel was about 14 to 15 meters, or almost three times the assumed 5.7-meter tsunami.Given that ground level is 10 meters at Units 1 through 4 and 13 meters at Units 5 and6, Units 1 through 4 were inundated by about 4 to 5 meters of water, with Units 5 and 6being inundated by up to one meter.The inundated area includes the entire ocean side where the seawater pumps wereinstalled, and most of the main building area where the reactor buildings and turbinebuildings were located. www.jaif.or.jp
    by NHK Listener 4/18/2011 5:40:03 AM

  • NISA Orders Safety Measures in Wake of March 11 Earthquake:Power Utilities Must Secure Emergency Power Sources The Nuclear and Industrial Safety Agency (NISA) has instructed all nuclear powerstations (NPSs) in Japan to implement safety measures for emergencies based on theexperience of the recent earthquake disaster on March 11. It will review the responsesof each power utility company in the country by the end of April.NISA will ascertain, analyze and evaluate the full picture of the accident, including the mechanism whereby a major tsunami following the Great East Japan Earthquake ofMarch 11 devastated the Fukushima Daiichi NPS, owned and operated by the TokyoElectric Power Co., Inc. (TEPCO), and will then take sweeping action. More: www.jaif.or.jp
    by NHK Listener 4/18/2011 5:42:01 AM

  • Nuclear Accident at Fukushima Daiichi Raised from INES Level 5
    to 7: NISA Reevaluates Volume of Radioactive Material Released

    With assistance from JNES, the Nuclear Safety Commission (NSC) of Japan also calculated the total volumes of the radioactive materials released from the NPS into the environment between March 11 and April 5. It estimated the total iodine-131 andcesium-137 at 630,000 iodine-equivalent TBq. (630,000 x 10^12 Bq.). According to thedata released by the NSC, the ***ulative released volume increased sharply on March25, which is thought to have been caused by damage to the pressure suppression poolat Unit 2.NISA noted that neither its estimate nor that of the NSC was much more than 10% ofthe total amount of iodine-131 and cesium-137 released by the Chernobyl accident (5.2million iodine-equivalent TBq.). With assistance from JNES, the Nuclear Safety Commission (NSC) of Japan alsocalculated the total volumes of the radioactive materials released from the NPS into theenvironment between March 11 and April 5. It estimated the total iodine-131 andcesium-137 at 630,000 iodine-equivalent TBq. (630,000 x 10^12 Bq.). According to thedata released by the NSC, the ***ulative released volume increased sharply on March25, which is thought to have been caused by damage to the pressure suppression poolat Unit 2.NISA noted that neither its estimate nor that of the NSC was much more than 10% ofthe total amount of iodine-131 and cesium-137 released by the Chernobyl accident (5.2million iodine-equivalent TBq.). www.jaif.or.jp
    by NHK Listener 4/18/2011 5:45:00 AM

  • www3.nhk.or.jp Edano: evacuees may return home in 6 months Japan's Chief Cabinet Secretary says residents around the troubled Fukushima Daiichi nuclear power plant, who are currently displaced, may be able to return to their homes in 6 months at the earliest.Yukio Edano was speaking on Monday, one day after the plant operator Tokyo Electric Power Company unveiled a plan to get the plant under control..The plan aims to achieve a steady reduction of radiation in the first 3 months and, in the next stage, to get the release of radioactive materials under control 6 to 9 months from now.Edano said the timetable was compiled by experts and he believes it is feasible.He added that the government will closely monitor the situation because it is still too early to relax with continuing aftershocks.Edano said the completion of the second stage of the plan will serve as a target after which some residents may be able to return to their homes.Monday, April 18, 2011 13:28 +0900 (JST www3.nhk.or.jp

    by NHK Listener via Www3.nhk.or.jp 4/18/2011 5:49:15 AM

  • @NHK do you believe him?
    by elainekirk 4/18/2011 5:52:03 AM

  • Earthquake map www.youtube.com
    by ch 4/18/2011 5:53:58 AM

  • @nhk are daini still running on diesel?
    by elainekirk 4/18/2011 6:04:23 AM

  • @elainekirk Pretty sure they have offsite power like daiichi.
    by NHK Listener 4/18/2011 6:06:18 AM

  • unfortunately, elaine kirk, and nhk listener, daiini is the dark horse.
    by wrshpr 4/18/2011 6:06:41 AM

  • @elainekirk 惻Fukushima Dai-ni NPS (According to Tokyo Electric Power Company Inc.)-The external power is secured.-There are no unusual data in plant parameters.-There are no unusual data measured at monitoring posts. www.nisa.meti.go.jp
    by NHK Listener 4/18/2011 6:09:43 AM

  • The Japanese officials were pressed for a number for a "conclusion" to the crisis, so out pops nine months. Is it ironic that this is about the time the "Great East Japan Earthquake" babies will be born?
    by Jim Carver 4/18/2011 6:12:45 AM

  • As of 12th April, 2011 Fukushima Dai-ichi has released 3.7x10^20 Bq It is estimated Chernobyl released 5.2x10^21 Bq or about 7% of Chernobyl's. Officials state that Fukushima could eclipse that.
    by Jim Carver 4/18/2011 6:19:13 AM





  • Smoke from Kashiwazaki-Kariwa nuclear complex
    Posted on April 17, 2011
    by Aaron Hutchins| Leave a comment
    More problems for Tokyo Electric. Another one of their nuke plants, in Niigata Prefecture, started smoking. The smoke came from a control panel.

    The Kashiwazaki-Kariwacc nuclear plant is located on the west side of Honshu, opposite where the March 11, 9.0 quake hit.

    TEPCO officials say the control panel started smoking when they were checking water [...] Continue Reading
    by ch edited by elainekirk 4/18/2011 6:46:01 AM

  • @ch It happened on Saturday..here is article... www.google.com
    by colormered 4/18/2011 6:55:35 AM

  • @colormered ty
    by ch 4/18/2011 6:56:32 AM

  • (Reuters) - Most Japanese want a new prime minister to lead the massive rebuilding needed after last month's earthquake and tsunami, newspaper polls showed on Monday, as the head of government was again scolded in parliament for his handling of the disaster. www.reuters.com
    by NHK Listener 4/18/2011 7:03:15 AM

  • An AP item about spectrograms and audio files which captured sound waves associated with the March 11 earthquake off the northern coast of Japan.

    by NHK Listener 4/18/2011 7:10:26 AM

  • @NHK Listener Thank you for all of your many sensible contributions to this blog.
    by gabe 4/18/2011 7:19:16 AM

  • by NHK Listener via I.min.us 4/18/2011 7:29:13 AM

  • by NHK Listener via I.min.us 4/18/2011 7:29:36 AM

  • Check out this link about "cold fusion". I posted yesterday but it was overlooked. This is not interesting news I guess because a)it is not a disaster b)it is not used in military. But it doesn't produce nuclear waste and any form of radiation emission ceases with the device shutdown. Who knows, in a few years you might run your car with it pesn.com
    by talisker 4/18/2011 7:33:15 AM

  • @nhk what is that you have found?
    by elainekirk 4/18/2011 7:34:48 AM

  • @elainekirk That is the plan layouts for Oyster creek GE BWR Mark 1 Top view and side view
    by NHK Listener 4/18/2011 7:37:11 AM

  • @Nhk good find :)
    by elainekirk 4/18/2011 7:55:12 AM

  • Something seems hot today...
    by hudebnik 4/18/2011 8:09:53 AM

  • @hudebnik hopefully openmind is about to put pic on here
    by elainekirk 4/18/2011 8:10:46 AM

  • STEAM ONLY
    pointscope01.jp

    by VeenOui via Pointscope01.jp 4/18/2011 8:11:17 AM

  • @veenoui a technical point here we will discuss, you say steam I say smoke @openmind says smoke anymore takers?
    by elainekirk 4/18/2011 8:12:48 AM

  • Have there been any plant parameters since 15 Apr?
    by hudebnik 4/18/2011 8:13:30 AM

  • @hudebnik if you scroll down a little I seem to recall some scary figures
    by elainekirk 4/18/2011 8:15:04 AM

  • @openmind sorry just found you in mod you are now on autopost
    by elainekirk 4/18/2011 8:15:58 AM

  • @elainekirk - thanks
    by openmind 4/18/2011 8:17:53 AM

Japan Earthquake | Page 745

Who's Blogging
  • hudebnikhudebnik
  • albleealblee
  • UKValUKVal
  • Oliver (ScribbleLive)Oliver (ScribbleLive)
  • Jonathan KeeblerJonathan Keebler
  • kaykodhkaykodh
  • PKelleyPKelley
  • MarkfmMarkfm
  • AngieAngie
  • DebDeb
  • Mid ValleyMid Valley
  • Pedro Jesus
  • Matt (ScribbleLive)Matt (ScribbleLive)
  • George GibbGeorge Gibb
  • elainekirkelainekirk
  • lillymunsterlillymunster
  • deandean
  • bobo
  • EdanoEdano
  • IanGoddardIanGoddard