Thats what I'm researching RBeaner. trying to sequence from T=0 out to T+90 minutes..
by dean 5/10/2011 9:48:34 PM

If we get a list of the plant power systems and them X those out that were lost on EQ and subsequent main steam valve closing which takes out the turbine along with the secondary turbine power for plant systems and instrumentation.. then we can begin to fully understand
by dean 5/10/2011 9:49:50 PM

what was it fitter?
by dean 5/10/2011 9:50:48 PM

www.nucleartourist.com some good start information
by dean 5/10/2011 9:53:28 PM

some are in the basement and some out back @ fitter
by dean 5/10/2011 9:53:52 PM

nancy.. i think the site layout what we have some where and cross sectional of the building shows the diesels in the basement.. and the one shows the elevation of the diesel as compared to the height of the tsunami which would have engulfed it
by dean 5/10/2011 9:57:37 PM

monorail probably for equipment removal
by dean 5/10/2011 9:58:54 PM

check on page 12 of the shepard document nancy.. it shows the turbine room ..
by dean 5/10/2011 10:00:04 PM

I don't even think the STEAM DRIVEN FEED WATER pump worked
by dean 5/10/2011 10:00:53 PM

typically a motor generator set is what is used for the exciter on the generator or and also is used in older units called MG sets
by dean 5/10/2011 10:02:40 PM

R6 is the only unit that has an air cooled diesel emergency generator.. all others I assume are water cooled.. not sure where the water comes from yet tho.. but assumed is clean eater... from auxillary system
by dean 5/10/2011 10:04:07 PM

I have an email sent off the fairbanks diesels..
by dean 5/10/2011 10:05:02 PM

I am going on the original plant @ jim not the newer designed ones... unless they upgraded diesel generators those old CLUNKER would be old schooll
by dean 5/10/2011 10:05:48 PM

NPP
by dean 5/10/2011 10:06:17 PM

i wish we had an electrical schematic of that place.. or at least of a plant like those in usa
by dean 5/10/2011 10:06:56 PM

Diesel power to system safety equipment like critical water supply cooling instrumentation valves etc..
by dean 5/10/2011 10:07:40 PM

ha ha.. wow @ fitter... your in the news
by dean 5/10/2011 10:08:16 PM

yes Jim, I just think that with all the stuff happening due to unexpected consequences of the EQ then tranformer loss... the conditions worsens quicker that we think.. in the PCV but our research will hopefully prove out
by dean 5/10/2011 10:09:28 PM

@ fitter I believe from what I've read they are the emergency diesels.. if the mono rail runs accross the top that is what we used to pull the heads off the diesel for maintenance
by dean 5/10/2011 10:12:02 PM

me too Jim... if the diesels would have been higher in the facility they would have functioned longer but with no cooling they really get hot fast..
by dean 5/10/2011 10:13:05 PM

I will tomorrow fitter... trying to figure out the vintage of that year 1970.. .back in those day.. ENTERPRISE DIESELS were the main ones sold
by dean 5/10/2011 10:13:41 PM

another thing we'venot discussed is the plant air system and or instrument air systems.. all those big control valves have to have diaphram air and if it's lost valves begin to go to fail safe modes.
by dean 5/10/2011 10:15:19 PM