In April 2005, the investigation results on the thermal insulation etc. of BWRs and PWRs and
interim measures such as a revision of operation proc edure s , we re reported by several
licensees. NISA considered that the interim measures reported by the licensees were adequate
as they were equivalent in content to the measures of which effectiveness was verified in the
U.S.A. NISA considers that full implementation of the interim measures are essential in order
not to cause an important-to-safety problem until the measures on the equipment, such as
larger strainers or screens etc., will be completed, and NISA instructed the licensees to
implement the interim measures and has been checking the implementation status by the
Operational Safety Inspection etc. For the effectiveness evaluation of the strainers of BWRs, it
was reported that the effectiveness was not confirmed at some nuclear installations as a result
of a conservative evaluation in accordance with the U.S. regulatory guides. NISA studied the
adequacy of those evaluations and measures at the Working Group for Safety Assessment, of
the Nuclear Reactor Safety Subcommittee, under Nuclear and Industrial Safety Subcommittee.
As NISA, receiving the results that the larger strainers and replacement of the thermal
insulation are required, instructed in October 2005, to implement the measures for BWRs. All
BWR licensees have been implementing the measures in accordance with the instruction. This
status of implementation was also reported to the NSC.