good link NHK.. where did you get that one? thoughts?
by dean 4/15/2011 6:44:38 AM

bull doze all the debris into a pit, cover, put protective cover over all around the plants.. to hold debris down, containment that's the key..
by dean 4/15/2011 6:48:27 AM

I'm not familiar with the typhoon or cyclone seasons there but when I was in VIET NAM their storms would rip 4 foot tent pegs out of the ground
by dean 4/15/2011 6:52:31 AM

NHK. thats the lab where my career was at.. and I consult back..
by dean 4/15/2011 7:13:16 AM

hank.. inside the core, the control rods (safety rods) have to be the right size to keep the core "sub critical"... even when all the fuel handing is done... in the spent fuel pools... the storage racks are built with lined positions with a neutron poison material to absorb neutrons, the racks keep the fuel elements fixed from forming a critical array, and the water contains a boron concentration
by dean 4/15/2011 7:15:42 AM

How often are control rods replaced?
by elainekirk 4/15/2011 7:22:15 AM

elaine,, the control rods are given a value of so much negative reactivity .. they measure it in a unit of WORTH.. and the technical safety requirements for the facility will dictate how much negative worth the control rods must always have.. they look at the operating history on the rods and then have limits prior to removal... most reactors perform control rod worth tests as part of operations.. usually at startup
by dean 4/15/2011 7:34:11 AM

I believe I remember at chernobyl of a system to maintain cooling or at least keeping water circulating through some part/parts of the plant.. I believe they will look at the existing facility for waste treament and design a cooling/circulating systems to the buildings. Once debris is removed from atop the building/main floor area.. I foresee some work to cover the reactors, establish better containment and possibly remove some of the undamaged fuel... not sure how that will happen.. ie: one at a time.. with remote controls.. into a shielded cask. of some kind..
by dean 4/15/2011 7:37:17 AM

@dean righty ho it is just I was wondering....Actually once a reactor is loaded and chuntering how long can it chunter before next stopage
by elainekirk 4/15/2011 7:38:14 AM

@nhk Really oooo now thanky
by elainekirk 4/15/2011 7:39:13 AM

commercial plants typically run for 1 year .. sometimes more ... they want to get the maxium useage out of the fuel
by dean 4/15/2011 7:39:22 AM

NHK.. I think at some point with the NRC/DOE/IAEA, and coupled with the plans from MITSUBISHI/GE/ AREVA and other big companies,, we will begin to hear recovery plans.. got to do something to stop water and maybe the cranes are helping with those sheet metal pieces.. or clearing debris
by dean 4/15/2011 7:45:56 AM

NHK .. this week when i traveled to work here.. I read some things going on with the robotics going there etc.. their mission will be revealed soon I think.. it's going to be a tuff uphill challenge to incorporate all the "help" being poured into Japan.. with all their rules and regulations and interfaces for doing work
by dean 4/15/2011 7:50:01 AM

www.chernobylee.com the have to be studying the chernobyl recover plan in detail for lessons learned then new design
by dean 4/15/2011 7:52:16 AM

@nhk it is many many years since I saw a prog showing the first robotic car production. I was impressed then and still am.
by elainekirk 4/15/2011 7:59:01 AM

by dean 4/15/2011 8:04:00 AM

by dean 4/15/2011 8:04:05 AM

@nhk why are they comparing it to reactor cooling water? one would expect cooling water from the reactor to be cool during normal ops but that is surely not comparable to the temp of water in a sfp
[er, @elainekirk, were you referring to thermal temperature? I might be wrong but the news report seemed to be referring to radioactivity and not temperature. Thanks. - Alblee]
by elainekirk edited by alblee 4/15/2011 9:00:01 AM