Japan Earthquake | Page 986

  • Im off to work have a good day.
    by carabnr 5/5/2011 12:18:44 PM

  • @fitter I just did that from memory but I will find it along with Nancy's doc when I get in later I hope
    by elainekirk 5/5/2011 12:19:01 PM

  • @carabnr It seems to now have a typo in it... go here to get to the photo tour page www.houseofoust.com
    by Nancy edited by elainekirk 5/5/2011 12:19:01 PM

  • @carabnr by have GOOD DAY
    by fitter 5/5/2011 12:19:06 PM

  • @carabnr have a good day
    by elainekirk 5/5/2011 12:19:15 PM

  • @all. The EQ docs is my current project, trying to grab the relevant docs, get them translated and online. If something more urgent comes up that I should be after let me know. We are waiting on George to get back before we can get the website going. There is a glitch in his web hosting we need fixed and don't have the access to do it.
    by Nancy 5/5/2011 12:20:37 PM

  • @all (except gremlins) how many more strange things I have fixed link Nancy
    by elainekirk 5/5/2011 12:20:53 PM

  • good morning ... waving hi
    by dean 5/5/2011 12:20:59 PM

  • @dean hi
    by elainekirk 5/5/2011 12:21:19 PM

  • @elainekirk Thanks! I am not logged into mod right now.
    by Nancy 5/5/2011 12:21:22 PM

  • @Nancy what is the eq ?
    by fitter 5/5/2011 12:21:22 PM

  • Hi Dean!
    by Nancy 5/5/2011 12:21:27 PM

  • @dean good moring dean
    by fitter 5/5/2011 12:22:15 PM

  • Morning Dean, Nancy and Bye to @carabnr
    by Angie 5/5/2011 12:22:29 PM

  • @fitter earthquake related information on the plant. There was required testing after the 2007 quake and supposedly retrofit work. The identical reactors at hamaoka were supposed to have roof braces and a bunch of other work. Chubu who runs it opted to shut down the reactors rather than do all the needed work. I am looking at the testing and retrofit done on FUKU. Not finding much work done to retrofit, as in they didn't bother.
    by Nancy 5/5/2011 12:22:54 PM

  • catching up here... is the consensus that the #3 RPV lifted and is tilted? I think Edano directed me to his write up
    by dean 5/5/2011 12:22:56 PM

  • @Nancy can we still post the raw info here, there are things that other might use (me.. pipe is not as much intrest to other, but there is a lot of infor that goes undetected that is very informative .... you have a pic, don't know how to identify, but it has a great pipe systm connection shown... ties into a tank... its a great shot
    by fitter 5/5/2011 12:26:20 PM

  • @dean I have to further think on that conclusion.... at one point i counted 56 nozzle connections... also do you know were i can find the original info on the shock absorbers.. would like to add to my drawing, but need to clairify what i am adding
    by fitter 5/5/2011 12:28:51 PM

  • www.bloomberg.com some history on EQ
    by dean 5/5/2011 12:30:08 PM

  • @dean graylock engineering got back to me, they do not supply RPV gaskets... he check with someother engineers and had no answers... but i need to get back to him... and see if he knows of any other systems that they are in..
    by fitter 5/5/2011 12:30:59 PM

  • not sure on the spring hangers or seismic restraints fitter but will try to check
    by dean 5/5/2011 12:31:06 PM

  • @dean do you know how to source info on a "patent"
    by fitter 5/5/2011 12:32:03 PM

  • this was for unit 4 - In 1988, Hitachi met with Tanaka to discuss the work he had done to fix the dent in the vessel. They concluded that there was no safety problem, said Hitachi spokesman Yuichi Izumisawa. “We have not revised our view since then,” Izumisawa said.

    In 1990, Tanaka wrote a book called “Why Nuclear Power Is Dangerous” that detailed his experiences.
    by dean 5/5/2011 12:32:47 PM

  • @dean on the shock absorbers i meant the horizontial braces shown on the reator image that has been posted
    by fitter 5/5/2011 12:33:15 PM

  • @fitter let me know where you found the image and I can post it here.
    by Nancy 5/5/2011 12:37:18 PM

  • fitter.. the only applications I have seen for graylock in my experience is for high pressure / temperature fittings on water flow systems
    by dean 5/5/2011 12:39:05 PM

  • Nancy.. are you wanting some information in general or historical on EQ's at the fukushima reactors?
    by dean 5/5/2011 12:39:33 PM

  • @dean there are a couple of big flaws in Edano's theory. We know the round RPV cap is still on for sure. Heat images show it with steam and heat escaping from a few places around it. The flat dark area above the work floor that was thought to be the RPV top edge is the metal crane that is lying across the work floor. The rubble around it on either side gives the impression that dark object jutting up is shorter, doesn't run across the floor. There are lots of other views that show there is nothing jutting up out of the RPV including the one image that shows half of the RPV well itself.
    by Nancy 5/5/2011 12:39:54 PM

  • @Nancy I'll look for it but not sure how to tell you which one, but its a new angle so that should help... the pipe looks like it goes to a square "pool" or object... but don't think the SFP tie-in below water level
    by fitter 5/5/2011 12:40:00 PM

  • @Nancy @dean its that the reactor that has the three small thermal dots???? thats what leads me to belive it still has some of its HATS
    by fitter 5/5/2011 12:41:42 PM

  • @dean what we are looking for is the post 2007 eq testing that TEPCO was required to do, the findings, what work was to be done and if any of it was actually done. Also comparing the same set of info at Hamaoka because their old reactors are the same design and were shut down due to how much it would take to make them eq sturdy. The end of all of this is to see if any EQ retrofits were actually done.
    by Nancy 5/5/2011 12:41:54 PM

  • @fitter yes. It has the RPV for sure. Yellow containment is the big maybe. I do think the RPV moved around in the EQ and pressure incident and that likely broke many connections.
    by Nancy 5/5/2011 12:42:51 PM

  • @Nancy can you pin those docs, so we can grab them for better info
    by fitter 5/5/2011 12:43:06 PM

  • @fitter So it is a specific drawing your after. Did you find it in the new photos I posted or in the TEPCO docs I posted, or somewhere else?
    by Nancy 5/5/2011 12:43:47 PM

  • @Nancy there seems to be an inconcistancy in the docs and drawings, that has me confused on the inner bulb... I need to go and put the info in proper building and years to see what applies... but some of the sites i saved are no longer there... or my computor won't go to them
    by fitter 5/5/2011 12:45:35 PM

  • @Nancy I was refering to the docs about the 2007 change requirments... I htink I missed them...
    by fitter 5/5/2011 12:46:50 PM

  • @Nancy there are items that I trace by the bolting pattern of the flanges/ valve locations / and terminolgy is a big thing here.... they call pipes "tubes" and lots of wierd things, but reading thier doc's explain what they would mean in the "field" (we have our own langauge)
    by fitter 5/5/2011 12:50:24 PM

  • @Nancy does anyone rember were the "gauge is on the site" they list instrumentation numbers on the worl plan... wanted to see if it traces back to the gauge they posted
    by fitter 5/5/2011 12:51:56 PM

  • @fitter some of those terminology oddities are due to Google Translate being less than perfect. Oh I have not posted the 2007 change and eq docs. Still working on translating them. Should have the whole lot done and posted by tomorrow.
    by Nancy 5/5/2011 12:51:57 PM

  • @fitter Are you talking about the sychroscope? That is about the only gauge I remember posting.
    by Nancy 5/5/2011 12:52:51 PM

  • @Nancy Tube vs pipe is just them.... and it looks like they still one hole a flange... need to figure out what eu does.. we may be the only one that two holes a flange
    by fitter 5/5/2011 12:53:23 PM

  • @Nancy you may not have been on , dean do you rember that big gauge that we were trying to figure if it was electric/neumatic
    by fitter 5/5/2011 12:54:50 PM

  • Edano urges Tohoku Electric to ensure safety at Onagawa nuke plant
    SENDAI, May 5, Kyodo
    Chief Cabinet Secretary Yukio Edano on Thursday urged Tohoku Electric Power Co. to ensure safety measures at the Onagawa nuclear power plant in Miyagi Prefecture so that it would be acceptable to people living near the facility, officials of the utility said.
    english.kyodonews.jp
    by Angie 5/5/2011 12:54:50 PM

  • does this site do a search at all
    by fitter 5/5/2011 12:55:40 PM

  • According to this they are still flooding (or trying to) containment on #1. Now I wonder how they are going to hook up the cooling system, possibly through the pipes into the Turbine building? www.stuff.co.nz
    by Nancy 5/5/2011 12:56:29 PM

Japan Earthquake | Page 986

Who's Blogging
  • hudebnikhudebnik
  • albleealblee
  • UKValUKVal
  • Jonathan KeeblerJonathan Keebler
  • Oliver (ScribbleLive)Oliver (ScribbleLive)
  • kaykodhkaykodh
  • MarkfmMarkfm
  • AngieAngie
  • Mid ValleyMid Valley
  • Matt (ScribbleLive)Matt (ScribbleLive)
  • George GibbGeorge Gibb
  • elainekirkelainekirk
  • PKelleyPKelley
  • lillymunsterlillymunster
  • deandean
  • bobo
  • EdanoEdano
  • DebDeb
  • Pedro Jesus
  • IanGoddardIanGoddard