by dean 5/5/2011 1:02:24 PM

www.militaryphotos.net all kinds of EQ photos on this link
by dean 5/5/2011 1:02:46 PM

Highlights from JAIF: 2 workers entered #1 to install a purifier for the air filter system. Groups of 3, wearing 30 pound air tanks, will work about 10 minutes/group installing 8 air ducts. Air purifier needs about 3 days to hopefully clear it enough for workers to stay inside for longer intervals. As soon as Sunday they hope to have workers start doing pipe/valve checks in preparation for setting up the new external cooling system. Open questions -- Will the air purifier be able to clean the air enough? Will the areas near pipes still be really radioactive, maybe need lead sheeting for protection? How to make any needed pipe/valve repairs? To circulate water, the WL needs to be brought up to the top of the rods, however dropping pressure, part of the evolution of adding more water, may risk another hydrogen explosion.
by Markfm 5/5/2011 1:02:55 PM

More JAIF: The new water cooling system is planned to circulate about 100 tons/hour of water, to cool the estimated 1500 KW of heat generated in the reactor. If it works well, temp should drop below 100C in anywhere from a few hours to a few days.
by Markfm 5/5/2011 1:05:12 PM

JAIF is the Earthquake status report, in the pinned links above.
by Markfm 5/5/2011 1:05:32 PM

be back later... UT time..
by dean 5/5/2011 1:07:31 PM

No idea what the light is at 2.
by Markfm 5/5/2011 1:27:59 PM

Worst case feared in early hours of Fukushima crisis
search.japantimes.co.jpby Markfm 5/5/2011 2:01:41 PM

Japan safety rules may close Hamaoka reactors-gov
www.reuters.comby Markfm edited by elainekirk 5/5/2011 2:08:30 PM

Workers enter Japan reactor for 1st time since blast
www.reuters.com 2 TEPCO staff, 11 contractors. "no possibility of another hydrogen explosion at the No.1 reactor due to progress in filling the containment vessel, " Noted that the rising temp in #3 is a watch item, and that sea sediment with 10000x normal radioactivity was found near the plant.
by Markfm 5/5/2011 2:13:35 PM

@Mark horses, stables and doors. What sickens me is that hamaoka did all the surveys etc requested of them in '06/07 and upgraded their plants in the manner requested of them at the time by the governmemnt agencies, they scrapped 1& 2 in the processd as they were Fukushima style bwr's and upgrading would have cost too much.
Contrast that with Tepco who didnt do the work/surveys/sonar requested of them even though in '07 another of their plants was damaged in a quake and you have to ask yourself who is running Japan......methinks irt be Tepco
by elainekirk 5/5/2011 2:19:42 PM

Whoever has the best "in" with the bureaucrats gets the most slack -- it happens everywhere, unfortunately.
by Markfm 5/5/2011 2:21:58 PM

@Jim I think they only went in the doorway
by elainekirk 5/5/2011 2:52:17 PM

The IAEA live audio conf is on:
redir.proxitv.speednet.at:8080by Markfm edited by elainekirk 5/5/2011 2:54:29 PM