This is a good chunk to start with, their report is further down the doc but I couldn't resist showing that some companies did take their responsibilities seriously -
adamswebsearch2.nrc.gov^pbntad01&LogonID=7b15196561f517dc6fcd3813cd369376&id=080660100
All the electric power companies are scheduling to finish the major part of the
geological research and the determination of the basic ground movement assumed by
the rese6rch results by the end of this fiscal year (March 2008) except for
Kashiwazaki-Kariwa Nuclear Power Station and Hamaoka Nuclear Power Station,
which had already submitted the seismic back check report. The seismic back check
will also be conducted for the safety significant components of one unit for eac.....
(2) On the event of the earthquake, the marine sonic survey is additionally conducted for
seven power stations (Note-i) and Rokkasho reprocessing plant. Therefore; all the
nuclear power which submitted the report on August 20, 2007, conducted the marine
sonic surveys, except for Hamaoka NPP, of which seismic back check report had
already been submitted and currently under safety review in the sub-committee on
the seismic and structural design